|
$42,001.00 to 43,000.00$205.00
<br /> $43,001.00 to 44,000.00$208.00
<br /> $44,001.00 to 45,000.00$211.00
<br /> $45,001.00 to 46,000.00$214.00
<br /> $46,001.00 to 47,000.00$217.00
<br /> $47,001.00 to 48,000.00$220.00
<br /> $48,001.00 to 49,000.00$223.00
<br /> $49,001.00 to 50,000.00$226.00
<br /> $50,001.00 to 51,000.00$229.00
<br /> $51,001.00 to 52,000.00$232.00
<br /> $52,001.00 to 53,000.00$235.00
<br /> $53,001.00 to 54,000.00$238.00
<br /> $54,001.00 to 55,000.00$241.00
<br /> $55,001.00 to 56,000.00$244.00
<br /> $56,001.00 to 57,000.00$247.00
<br /> $57,001.00 to 58,000.00$250.00
<br /> e. Remodeling over$58,000$253.00
<br /> * All of the above include a $15.00 Processing Fee.
<br /> (4) Northeast Neighborhood Development Area Overlay Zoning District a/k/a Northeast
<br /> Neighborhood Development Area Design Review Fees:
<br /> Required for all standalone residential or commercial new construction, in addition to
<br /> and separate from any other permit, processing, or review fee: $160.00
<br /> The Department's review or processing of all of the above listed matters is subject to
<br /> form and submission requirements which are available for inspection in the office of
<br /> the Building Department, and viewable on the City website, www.southbendin.gov.
<br /> (5) Engineering Review Fees:
<br /> a. Downspout/Drainage Disconnection Check: Field check to determine whether
<br /> building or site discharges stormwater through pipe conveyance into City sewer
<br /> system.
<br /> (1) Previously Confirmed Disconnect: exempt
<br /> (2) Single-Use Residential: $20.00*
<br /> (3) Other: $50.00*
<br /> *Downspout/Drain Disconnection Fee shall be waived until January 1, 2018.
<br /> b. Drainage Review (Required of all non-single-use residential) $150.00
<br /> c. Utility Verification Fee $50.00
<br /> (Ord. No. 9779-07, § III, 8-27-07; Ord. No. 9902-09, § I, 2-9-09; Ord. No. 10137-11, § II, 12-12-
<br /> 11; Ord. No. 10177-12, § I, 8-13-12; Ord. No. 10394-15, § II, 10-26-15; Ord. No. 10403-15,
<br /> § I, 11-23-15; Ord. No. 10575-18 , § II, 1-22-18)
<br /> Sec. 6-4.2. Building Code available.
<br /> At least two (2) copies of the Building Code, together with amendments and
<br /> supplements thereto, shall be kept in the Department office for public inspection.
<br /> (Ord. No. 8243-92, § 1; Ord. No. 9779-07, § II, 8-27-07)
<br /> Sec. 6-4.3. Enforcement by Building Department.
<br /> (a) The Building Department,with the assistance of the South Bend Fire Department as necessary or
<br /> required, is the City agency to administer and enforce the rules, regulations,and code adopted and
<br /> promulgated under this chapter.
<br /> (b) No building permit will be issued to a person that would cause a violation of IC 22-15-3-7.
<br /> (c) This building code does not apply to an industrialized building system or mobile structure that is
<br /> certified under IC 22-15-4.
<br /> (d) Whenever a person applies for a building permit for a Structure that is not being used or
<br /> constructed in conformance with applicable provisions of an applicable zoning ordinance or other
<br /> ordinance relating to land use,the Building Commissioner is authorized to withhold the issuance
<br /> of requested permit(s) until such time that the property is brought into conformance with
<br /> applicable ordinances.
<br /> (e) Stop Work Order
<br /> (1) The Building Commissioner may issue an order requiring suspension of the pertinent
<br /> Construction(stop-work order)in accordance with this section. A stop-work order may also
<br /> take the form of a cease and desist order.
<br /> i. The stop work order shall:
<br /> 1. Be in writing.
<br /> 2. State with specificity the Construction to which it is applicable and the
<br /> reason for its issuance.
<br /> 3. Be posted on the property in a conspicuous place.
<br /> Page 7 of 31
<br />
|