Laserfiche WebLink
Project Number: 1024092688 <br />Project Name: Basney BMW Watermain Extension <br />Project Location: US33 & CR40 Sewer and Water Extension <br />Date: 5/22/2025 4SA11* <br />Engineer's Opinion of Probable Construction Costs <br />City portion only <br />NO. ITEM UNIT QUANTITY UNIT COST TOTAL <br />Water Main, 1 Mob/demob each 1 $5,000.00 $5,000.00 <br />Lateral, and 2 Traffic Control for LaSalle Trail lump 1 $6,500.00 $6,500.00 <br />Fittings 3 12" DI Watermain, installed In.ft. 693 $130.00 $90,090.00 <br />4 Fire Hydrant Assembly w/ Aux. Valve, installed each 1 $8,865.00 $8,865.00 <br />5 12" DI gate valve, installed each 1 $5,375.00 $5,375.00 <br />6 12"x12"x8" DI Tee, installed each 2 $2,335.00 $4,670.00 <br />Sub Total $120,500.00 <br />Total $120,500.00 <br />