Laserfiche WebLink
SECTION 5 - WATER WORKS <br />SECTION 5 - WATER WORKS <br />SECTION 5 - WATER WORKS <br />SECTION 5 - WATER WORKS <br />3 <br />0 <br />z <br />Li <br />w <br />0 <br />00 <br />ID <br />NO. <br />REVISIONS <br />Excavate for Pipe <br />Bell & Barrel <br />0.6 O.D. <br />Maximum Trench Width <br />24" Wider Than O.D. of Pipe <br />,dr..do Finish Grade <br />Backfill - In Streets, Alleys, or Driving Areas: <br />Backfill Shall be of Select Native Granular Material or B-Borrow Material Free of <br />Debris, Organic Material and Large Stones. <br />Placed in 6" Layers, Solidly Tamped to Sub -Grade of Street Base. <br />Backfill Shall be Compacted to 100% Standard Proctor Density. <br />Backfill - In Easement or Open Areas: <br />Backfill Material Shall be of Select Native Granular Material, Placed in 12" Layers, <br />Free of Debris, Organic Material, and Large Stones. <br />Backfill Shall be Compacted to 95% Standard Proctor Density. <br />Initial Backfill- <br />Select Excavated Material Mechanically <br />Tamped to 95% Standard Proctor Density <br />Removable Flowable Backfill Shall be Placed for all Areas <br />Within 5 Ft. of Pavement to 12" Above Pipe Crown. Above <br />This Limit, Structure Backfill Shall be Used. <br />Bedding Material - <br />Select Excavated Material Mechanically <br />Tamped to 95% Standard Proctor Density <br />Undisturbed Earth <br />NOTES: <br />1. These trench and bedding details are for pipe structural requirements only. The <br />contractor is solely responsible for safety of operations. The contractor shall slope <br />trench walls, provide protective work boxes, and/or shore and brace all <br />excavations as the contractor determines necessary for safety of operations, and <br />in conformance to IOSHA Regulation 29 C.F.R. 1926, Subpart P for Trench Safety <br />Systems. <br />2 Fomultiple pipes in same <br />rLine hof <br />ar Place bedding to Spring first pipe <br />across entire trench width. <br />\�`p\\�\P M BOy�/'''''' <br />�\ �;F �'\ ST ERF� J' ' <br />b. Placement of next pipe, re -excavate <br />N 0 <br />trench as needed. Then place bedding <br />= = • = _ <br />- PE10809510 <br />as noted above. <br />! <br />c. For additional pipes repeat as required. <br />STATE OF w <br />3. Minimum easement width for water main shall be 15'. <br />'',, FS '' ND I ANP \4 <br />4. Minimum obstruction setback requirement from water main shall be 10'. <br />, <br />Obstructions shall include structures, other utilities, trees, and landscaping.% <br />\��`�` <br />IONAL <br />REF STD SPEC SEC 5-3.2 and 5-3.9 Kara . Boyle , P .D., P.E. Date <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />�UrHs <br />EFFECTIVE DATE: June 26, 2018 CITY OF SOUTH BEND �04 <br />Item Revision Approved Date W <br />' - STANDARDS FOR DESIGN <br />x 'aa5 AND CONSTRUCTION <br />STANDARD <br />TRENCH DETAIL FOR WATER MAIN IN SUITABLE SOIL 5-6 <br />BY I DATE <br />4" Min. or as <br />Directed by <br />Engineer <br />Maximum Trench Width <br />24" Wider Than O.D. of Pipe <br />Finish Grade <br />Backfill - In Streets, Alleys, or Driving Areas: <br />Backfill Shall be of Select Native Granular Material or B-Borrow Material Free of <br />Debris, Organic Material and Large Stones <br />Placed in 6" Layers, Solidly Tamped to Sub -Grade of Street Base. <br />Backfill Shall be Compacted to 100% Standard Proctor Density. <br />Backfill - In Easement or Open Areas: <br />Backfill Material Shall be of Select Native Granular Material, Placed in 12" Layers, <br />Free of Debris, Organic Material, and Large Stones. <br />Backfill Shall be Compacted to 95% Standard Proctor Density. <br />Initial Backfill- <br />INDOT Class II or III Granular Material Mechanically <br />Tamped to 95% Standard Proctor Density <br />Removable Flowable Backfill Shall be Placed for all Areas <br />Within 5 Ft. of Pavement to 12" Above Pipe Crown. Above <br />This Limit, Structure Backfill Shall be Used. <br />Bedding Material- <br />INDOT Class II or III Granular Material Mechanically <br />Tamped to 95% Standard Proctor Density <br />Undisturbed Earth <br />NOTES: <br />1. These trench and bedding details are for pipe structural requirements only. The <br />contractor is solely responsible for safety of operations. The contractor shall slope <br />trench walls, provide protective work boxes, and/or shore and brace all excavations <br />as the contractor determines necessary for safety of operations, and in <br />conformance to IOSHA Regulation 29 C.F.R. 1926, Subpart P for Trench Safety <br />Systems. <br />2. For multiple pipes in same trench: <br />a. Place bedding to Spring Line of first pipe <br />across entire trench width. <br />b. Placement of next pipe, re -excavate <br />N 0 <br />trench as needed. Then place bedding <br />= • = _ <br />= • = PE10809510 • <br />as noted above. <br />c. For additional pipes repeat as required. <br />STATE OF <br />O <br />3. Minimum easement width for water main shall be 15'. <br />- T "!ND I ANP' \4 <br />'',, FS <br />4. Minimum obstruction setback requirement from water main shall be 10'. <br />,,,,,A \� <br />Obstructions shall include structures, other utilities, trees, and landscaping. <br />'''s%ONAL 0\`�� <br />\� <br />6/1 <br />REF STD SPEC SEC 5-3.2 and 5-3.9 Kara . BBooylle , P .D ., P.E. 6 2 Date <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />EFFECTIVE DATE: June 26, 2018 °4�UgE�d CITY OF SOUTH BEND <br />Item Revision Approved Date W <br />STANDARDS FOR DESIGN <br />'aQ5 x AND CONSTRUCTION <br />STANDARD <br />TRENCH DETAIL FOR WATER MAIN IN UNSUITABLE SOIL 5-7 <br />2810 Dexter Drive <br />Elkhart, IN 46514 <br />Phone: 574-266-1010 <br />Email: info@sam.biz <br />Restri <br />Action Restraints (Typ.) <br />NOTES: <br />1. Gate valves shall be manufactured by Clow, Mueller, Kennedy, <br />or approved equal. <br />2. Valve box shall be manufactured by Tyler Pipe Industries <br />Model 664-S or approved equal. <br />3. Gate valves shall be used on water main pipe 12-inches and <br />smaller. <br />4. Valve spacing shall be no greater than 1,000 feet. A main line <br />valve shall be placed at each intersection. <br />5. Valve locations shall be configured to be within 3 Ft. of <br />adjoining fittings. <br />REF STD SPEC SEC 5-2.5(a <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS o+ x <br />EFFECTIVE DATE: June 26, 2018 <, -; �, <br />Item Revision Approved Date = - <br />1 Kennedy Addition 10/26/2021 <br />TYPICAL GATE VALVE AND BOX <br />DRAWING FILE: 92688-DESIGN.DWG <br />CERTIFICATION DATE: 06/09/2025 <br />HORIZONTAL SCALE: NONE <br />VERTICAL SCALE: NONE <br />ENGINEER: BENJAMIN STANLEY, P.E. <br />TECHNICIAN: AAC <br />Iron <br />Remain <br />\\\\�\\\\\1iIIIII///////// <br />•=PE10809510= • <br />STATE OF Q <br />AND I ANP\� ' <br />TONAL <br />6/26/18 <br />Kara M. Boyl s, Ph.D., P.E. Date <br />CITY OF SOUTH BEND <br />/ <br />�\,\LEE ST'% <br />m : No. 12200658 ' <br />_. ._ <br />STATE OF ; <br />ONAL11W\\\ <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />STANDARD <br />5-8 <br />JOB NUMBER: <br />Fire Hydrant (Restrained With <br />Wedge Action Restraints) <br />6" Gate Valve (Restrained With <br />Wedge Action Restraints) w/ Box <br />6" x Min. 13" ---\ <br />O <br />x _" x 6" Tee (Restrained <br />With Wedge Action Restraints) / <br />6" x Min. 24" <br />I <br />I <br />Hydrant Drainage Pit (See Note 2) <br />l i <br />I'. I <br />ELEVATION <br />O <br />PLAN <br />Fire Hydrant (Restrained With <br />Wedge Action Restraints) <br />6" x Min. 24" <br />- 6" Gate Valve (Restrained With <br />Wedge Action Restraints) w/ Box <br />6" x Min. 13" <br />_" x " x 6" Tee (Restrained <br />With Wedge Action Restraints) <br />NOTES: <br />1. Any subgrade disturbed beneath hydrant shall be thoroughly compacted or suitable <br />material shall be furnished, placed and compacted to provide a firm foundation for the <br />hydrant. <br />2. Hydrant drainage: To prevent freezing of the hydrant barrel if it were not drained, a <br />drainage pit 2'x2'x2' shall be excavated below the hydrant and filled with course gravel <br />or crushed stone mixed with sand to a depth of 6" above the hydrant opening, <br />providing sufficient aggregate void space to more than equal the volume of the barrel. <br />The drainage it should neither be near, nor have a connection to a sewer. <br />p <br />3. Hydrant painting: Hydrants to be painted red, white and blue per manufacturers paint <br />specs. <br />4. All pipe, fitting and valve joints shall be restrained with wedge action restraints. <br />Boy''', <br />`• `PE10809510' • <br />STATE OF <br />/ONAL <br />'///IIIIIIIII\\\\ <br />REF STD SPEC SEC 5-2.6 and 5-3.10 Kara . Boyle , P .D., P.E. Date <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />EFFECTIVE DATE: June 26, 2018 4��gE�dx CITY OF SOUTH BEND <br />Item Revision Approved Date W <br />STANDARDS FOR DESIGN <br />"5 AND CONSTRUCTION <br />STANDARD <br />FIRE HYDRANT ASSEMBLY 5-11 <br />1.5" HAC SURFACE <br />2.5" HAC BINDER <br />4" COMPACTED INDOT NO.53 <br />AGGREGATE BASE COURSE, CRUSHED <br />CONCRETE, SLAG, OR LIMESTONE <br />6" INDOT NO.53 AGGREGATE <br />ASPHALT PAVEMENT SECTION <br />FOR MULTIPURPOSE TRAIL <br />NOT TO SCALE <br />CONSTRUCTION DETAILS <br />BASNEY ENTERPRISES, 52203 S.R. 933, <br />PT. NW 1 /4, SEC. 24, T38N, R2E, <br />CLAY TWP., ST. JOSEPH CO., INDIANA <br />SHEET <br />