My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
38-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
sbend
>
Public
>
Common Council
>
Legislation
>
Upcoming Bills
>
2025
>
06-23-2025
>
38-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 9:57:31 AM
Creation date
6/17/2025 2:21:55 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) St.Joseph County Soils Map. <br /> (2) Maps depicting wetlands. <br /> (3) Maps depicting tloodplains and compliance with Sections 6-38 and 6-39 of the South <br /> Bend Municipal Code. <br /> (4) Maps depicting drainage basins/watersheds. <br /> (d) An"as built"elevation certificate must be submitted to the Building Commissioner.The <br /> certificate must indicate the difference between the lowest level of the foundation and the <br /> seasonal high-waterhigh-water level of any subterranean aquifer. <br /> (e) Visual inspection of the damp-proofing and drainage tile must be approved before the <br /> basement is back-filled and construction continues on the project. <br /> (Ord.No. 10235-13,§I,6-24-13) <br /> Sec.6-6.8.New well requirements and affected areas. <br /> (a) Before a new well permit is issued in the City,a Soils and Water Table Review shall be <br /> made to the Director of Public Works per Section 6-6.7 that also includes an Area of <br /> Influence defined as one-quarter('/)mile radius around the well head. <br /> (b) All property owners within the Area of Influence of any proposed new well shall be notified <br /> within thirty(30)days of any submission to a City entity of an intention to drill. <br /> (c) No new well permit shall be issued within a distance of three thousand feet(3,000')of any <br /> existing production well belonging to the City of South Bend in connection with the city's <br /> water supply. <br /> (Ord.No. 10235-13,§II,6-24-13) <br /> Sec.6-6.9.Required process when decommissioning a water well. <br /> (a) The St.Joseph County Health Officer and the Director of Public Works shall be notified at <br /> least thirty(30)days prior to the decommissioning of any water well. <br /> (b) Whenever a water well has been improperly decommissioned or discontinued for use and <br /> does not have formal inactive status,the St.Joseph County Health Officer and the Director <br /> of Public Works shall notify the owner of any costs incurred for such noncompliance,which <br /> such sums being payable in full within thirty(30)days of such notice and itemized billing. <br /> (Ord.No. 10235-13,§III,6-24-13) <br /> Sec.6-6.10.Suspension or revocation of registrations.refusal to issue registrations. <br /> (a) The suspension or revocation of any registration,or the refusal to issue any <br /> registration under this Code shall be for just cause after notice and opportunity for <br /> hearing.pursuant to the provisions of Section 4-16 of this Code <br /> Ihi .\registration issued under this Chapter may he suspended or revoked by the <br /> Building Commissioner it'it is determined that the holder of a registration has been <br /> Page 23 of 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.