Laserfiche WebLink
(3) The name and address of the owner. <br /> (4) The township in which the structure is located. <br /> (5) The name and address of the general contractor. <br /> (6) The State project number,if applicable. <br /> (7) The zoning of the property. <br /> (8) •The occupancy group/use of the structure. <br /> (-14 9) A statement that the described structure or portion of the structure has been <br /> inspected for compliance with the requirements of the codes for the occupancy and use <br /> for which the proposed occupancy is classified. <br /> (10)Any special stipulations and conditions of the building permit. <br /> (1 i)The name of the building official. <br /> (d) Temporary Occupancy.The building official is authorized to issue a Temporary Certificate <br /> of Occupancy before the completion of the entire work covered by the permit,provided that <br /> such portion or portions shall be occupied safely.The building official shall set a time <br /> period during which the Temporary Certificate of Occupancy is valid. <br /> (e) Revocation.The building official is authorized to,in writing,suspend or revoke a <br /> Certificate of Occupancy issued under the provision of this section wherever the Certificate <br /> is issued in error,or on the basis of incorrect information supplied,or where it is determined <br /> that the building or structure or portion thereof is in violation of any regulation of the <br /> provisions of the codes and/or ordinances. <br /> (Ord.No. 10225-13,§11I,3-25-13) <br /> Sec.6-6,3.Moving permit. <br /> (a) No person,firm,or corporation shall move any building or structure in the City or cause the <br /> same to be done without obtaining in advance a moving permit from the Department; <br /> provided,however,that the provisions of this section shall not apply to the moving of <br /> manufactured housing prior to its initial installation in compliance with Subsection 2 1 <br /> 02 I I(I)i6IBthe provisions of the South Bend Municipal Code. <br /> (b) The applicant must file with the Department a completed application on the form provided, <br /> with all information indicated on the application submitted in full and with all other <br /> required information,including: the extreme height,width and length of the structure when <br /> mounted;the proposed route over which the structure will be moved;a plot plan showing <br /> the structure in its proposed new location;affidavits from all public utility companies, <br /> railroads,service companies,and cable television companies with facilities along the <br /> proposed route,certifying that the applicant has deposited with such company or agency <br /> satisfactory surety to cover the cost of any damage or changes in facilities resulting from the <br /> moving of the structure over the proposed route;and any additional information the <br /> department deems necessary for enforcement of the Building Code.The applicant shall also <br /> provide a certificate of insurance showing property damage coverage in the amount of one <br /> million dollars($1,000,000.00)and liability coverage in the amount of five million dollars <br /> ($5,000,000.00),naming the City of South Bend as co-insured. <br /> (c) Within three(3)days after the completed application and required information has been <br /> filed,the Department shall submit the application and information to the Bureau of Traffic <br /> and Lighting,the Engineering Department,the Police Department,the Park Department and <br /> the Building Commissioner for review and recommendations,with their recommendations <br /> Page 18 of 51 <br />