Laserfiche WebLink
(2) Whenever a person applies for a building permit for a structure that is not being used <br /> or constructed in conformance with the Zoning Ordinance or any other ordinance <br /> relating to land use,the Building Commissioner shall withhold the issuance of the <br /> requested building permit until such time that the structure is brought into conformance <br /> with all applicable ordinances;provided,however,that if additional construction is <br /> necessary to achieve compliance,the Building Commissioner is authorized to permit <br /> such construction,which shall be performed in accordance with all applicable laws and <br /> subject to regulation and enforcement by the Building Department. <br /> (c) Permit revocation.The Building Commissioner shall revoke a building permit when any of <br /> the following is applicable: <br /> (1) The application,plans or supporting documents contain a false statement or <br /> misrepresentation as to a material fact; <br /> (2) The application,plans or supporting documents reflect a lack of compliance with <br /> building standards and procedures; <br /> (3) There is a failure to comply with any provisions of state or local law;or <br /> (4) The structure for which the building permit has been issued is not being used or <br /> constructed in compliance with the Zoning Ordinance or any other ordinance relating <br /> to land use. <br /> (d) Where a building permit for a building or structure has been issued prior to the effective <br /> date of the ordinance from which this section is derived,and provided that construction <br /> begins within six(6)months of the effective date and is diligently performed to completion, <br /> that building or structure may be completed in accordance with the approved plans on the <br /> basis of which the building permit has been issued,and further,may,upon completion,be <br /> occupied under a certificate of occupancy for the use for which was originally designated, <br /> subject thereafter,if applicable,to the provisions herein for nonconforming buildings, <br /> structures,and uses. <br /> (e) Unless otherwise provided in the Building Code,the fees to be charged for the issuance of <br /> permits by the Department shall be paid at the time the permit is issued. <br /> (1) The fee for permits issued for residential and commercial new construction and <br /> building additions shall be based upon the following: <br /> a. Cost per Square Foot(CSF)times the total square footage(TSF)times the Local <br /> Variable Factor(LVF)of$0.00098.rounded down to the nearest whole dollar. <br /> b. Cost per square foot(CSF)shall be determined by the International Code Council <br /> Building Valuation Table in effect in January of each year. <br /> c. The cost per square foot(CSF)by occupancy classifications shall be amended as <br /> follows: <br /> 1. Groups F-I,F-2,H-I,H-2,H-3,H-4,and M shall have the same rate as A-3. <br /> 2. Groups 1-4,R-2,and R-4 shall have the same rate as I-1. <br /> 3. Groups S-1,S-2,and U shall have the same rate as R-3. <br /> d. Minimum fee—Forty Sixty dollars($640.00). <br /> (2) Permits issued for all alterations,repairs,remodeling of existing structures over five <br /> hundred dollars($500.00),fence installations,in-ground-swimming pool installations, <br /> communication towers,and utilities,as verified by the submitted documentation shall <br /> be subject to the following fee schedule: <br /> Estimated Construction Costs I Permit Fees 1 <br /> Page 4 of 51 <br />