Laserfiche WebLink
ZMABONMARCHE <br />Engineering • Architecture • Land Surveying <br />St. Joseph County/South Bend <br />Marion Court Residential Development <br />Marion Right of Way Construction Estimate <br />May 15, 2025 <br />Right of Way Work <br />Description <br />Quantity Unit <br />Unit Price <br />Cost <br />1. <br />Common Excavation <br />130 CYD <br />$20.00 <br />$2,600 <br />2. <br />Tree, Remove <br />4 EA <br />$1,500.00 <br />$6,000 <br />3. <br />4" Concrete Sidewalk <br />100 SYD <br />$65.00 <br />$6,500 <br />4. <br />Concrete Curb, Remove <br />35 LFT <br />$15.00 <br />$525 <br />5. <br />8" Concrete Drive Approach <br />30 SYD <br />$120.00 <br />$3,600 <br />5. <br />Compacted Aggregate, No. 53 <br />20 TON <br />$40.00 <br />$800 <br />6. <br />HMA Surface, 165 Ib/syd <br />3 TON <br />$110.00 <br />$330 <br />7. <br />HMA Intermediate, 275 Ib/syd <br />4 TON <br />$105.00 <br />$420 <br />8. <br />HMA Base, 440 Ib/syd <br />7 TON <br />$90.00 <br />$630 <br />9. <br />Concrete Curb <br />35 LFT <br />$40.00 <br />$1,400 <br />10. <br />Mulched Seeding, Type U <br />300 SYD <br />$3.00 <br />$900 <br />11. <br />Sanitary Sewer Manhole, 48" <br />1 EA <br />$5,500.00 <br />$5,500 <br />12. <br />Sanitary Sewer Pipe, 8" <br />165 LFT <br />$55.00 <br />$9,075 <br />13. <br />Connect to Structure <br />2 EA <br />$1,000.00 <br />$2,000 <br />14. <br />8' DIP Water Main <br />28 LFT <br />$130.00 <br />$3,640 <br />15. <br />Tapping Sleeve and Valve, 8" x 16" <br />1 EA <br />$12,000.00 <br />$12,000 <br />Total: <br />$55,920 <br />Bond Amount 125% of Total TOTAL: $70,000 <br />Page 1 of 1 <br />