Laserfiche WebLink
J <br />U <br />MP <br />0 <br />z <br />0 <br />0 <br />N <br />no <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />STR. NO 1 <br />San M <br />Rim:706.0 <br />8 IE (E):701.0 <br />- 8" IE (S):699.1 <br />°H PP/D <br />\o <br />I <br />I I <br />I I <br />I I = <br />STR. NO 100 _ <br />____---------- 1200 Gal Drywell <br />w/Flat Inlet Casting (O <br />Rim:705.42 <br />8 IE (NE):701.78 <br />36" IE:699.80 I I I <br />I I r L-- ________ 33LF24�� PERF. PIPE I I <br />IN 13' WIDE x 5' DEEP <br />I AGGREGATETRENCH I I I <br />STR. NO 101 <br />1200 Gal Drywell I <br />w/Flat Inlet Casting I <br />LOT 5 LOT 6 Rim:705.12 I <br />8" IE (SE):701.35 I <br />- - I 8" IE (E):700.67 I <br />36 IE:699.80 I <br />I <br />40 LF 24" PERF. PIPE <br />IN 13' WIDE x 5' DEEP I <br />AGGREGATE TRENCH I <br />I i I STR. NO 102 <br />Proposed 1200 Gal Drywell <br />R/W (Typ) w/Flat Inlet Casting <br />Rim:704.30 II <br />L - - - - - - V) Ul) Ul) Ln 36" IE:699.80 <br />Ex. San. Service I <br />�0. (F.V.Condition) " <br />I � LP <br />C OH� OH <br />Q C < < C < C <br />SMH <br />WEST MARION STREET <br />UTILITY MAINTENANCE <br />RESPONSIBILITIES DOWNSPOUT HEADERS <br />Al 14' Water Main: Public Downspouts from Units 1-10 shall be connected <br />I Water Main Extension: Public into the downspout headers shown <br />Alley I Abandon Ex. Lateral I- -4 Sanitary Sewer: Private <br />-I r Upstream from Prop. Clean -Out _ - - I I Storm Sewer: Private <br />PP/L II I I EXISTING FEATURES PROPOSED FEATURES <br />SS `° I ^ i of I I LEGEND LEGEND <br />�I <br />Ln <br />LOT 4 I I O CB Catch Basin <br />L �rP/L I I ®e Gas Meter HMA Pavement Section <br />WS a Ex. San. Service (Located Per <br />I __9 Guy Anchor <br />of City As -Built Video); <br />"t co I I Contractor to Expose Exist. LP Light Pole Concrete Pavement <br />I Sewer Lateral Prior to 0 PP Power Pole <br />- Construction & Notify Engineer 0 PP/D Power Pole w/Drop Asphalt Pavement Patch <br />CD LOT 3 SS °CO co r for Inspection; Per City Standard <br />I o _ If Required Based on 0 PP/L Power Pole w/Light <br />W c5 r Inspection, Line Exist. Lateral OUP Utility Pole <br />SAN. CLEAN -OUT I I from Sewer Main to ' Brick Pavement Patch <br />STORM Rim:706.58 I I Right -of -Way or Connection O sMH Sanitary Manhole Per City Standard <br />CLEAN -OUT 8" IE:701.39 Sign <br />Rim:706.47 I I I 3 Point As Shown & Connect Prop. - <br />8" IE:702.56 RIC I- o �, Lateral to Exist. Lateral <br />PP/0 10 ELECT I I � I ® w Water Valve coo Clean -Out <br />EASEMENT , - '' I �, _ _ <br />w Water Main W ® Water Valve <br />2 - - �- - - i = _ I I I �o I OH Overhead Utilities a® Water Service Shut Off Valve <br />H 75 LF 8 I I I I I^ I o I o Gas Line <br />0 DOWNSPOUT _ _ _ �� I N o I 6' ,� - - - Sign & Post <br />0 HEADER 78 LF 8 0.500 - I �- - - z - - - - - - 1 I LU I I T Telephone Line <br />1 @ 1_50% SI)R 35 <VC O° < `� I I I I " I I I - Swale Centerline <br />_ co � Foc Fiber Optic Line <br />iZ I - - E UG Electrical Line WS 1" Domestic Water Service <br />c ,! cn v`"i I I I I I > 1 % (w/Shut Off Valve As Shown) <br />�O �;, �„ I I o f Q y l-- 0 0 0 o Chain Link Fence <br />�. `n UNIT 7-10 LINE "D"; CLEAN -OUT (C-O) - - - - - - - STORMI I I Z II- - - / / / Wood Privacy Fence 6" SDR 35 PVC Sanitary Service @ Min. 1% <br />\ \ \ See Sheet C4.1 I 1 Q SS <br />\ \ 1st FI. & Porch \ I I (w/Sanitary Clean -Out As Shown) <br />\ Rim:706.68 I _J II <br />0<2- F.F. EL. 707.32 \ 18" IE:703.68 I LU I <br />I �iP I II I 8" STORM Downspout Header; <br />p ° FIRE HYDRANT L T 1 <br />I it I > Connect Bldg. Downspouts to 8" Header <br />ASSEMBLY w/Clean-Outs @ Bldg. <br />@ L SAN. CLEAN -OUT I 0 I II <br />LINE "C"; �Ln Rim:705.67 <br />U See Sheet C4.1 3:3; 8" IE:698.42 I 1 II UTILITY MAINTENANCE RESPONSIBILITIES <br />1 o CS I I I I II I <br />1 I I WATER MAIN - City of South Bend <br />J M p UNIT 6 ', _ I I <br />Easement Line (Typ) I o I II I SANITARY SEWER (ON PRIVATE PROPERTY) - Property Owner <br />ol a a Ws 1st FI. &Porch I II I <br />(dJ I F.F. EL. 707.28 co I SANITARY SEWER (IN R/W) - City of South Bend <br />N UNIT 5 ws cs <br />s 115 LF 8" DOWNSPOUT I �, <br />II Co. SS 1st FI. & Porch SS HEADER @ 1.50% I I I X I II- <br />I F.F. EL. 707.13 ° CONSTRUCTION NOTES <br />I II \ I STORM CLEAN -OUT I I II <br />E� I Rim:706.07 I I II I 1. Construction, materials, and testing shall be in accordance with the latest Standard Construction Specifications of the local <br />UNIT 4 <br />-v� I 1st FI. & Porch 8" IE:703.07 I I I II I utility owner. <br />O -�- < I WS F.F. EL. 706.86 I I I I 2. Contractor shall inquire all utility companies prior to construction for locations of underground utilities. Any damages done <br />87 LF 8 DOWNSPOUT <br />\\ UNIT 3 WS a a I LINE "B"; HEADER @ 1.50% I = J� II I to any public and/or private properties during construction shall be repaired at the Contractors expense. <br />1st FI. & Porch I See Sheet C4.1 I 0 II I 3. Unsuitable materials that could affect the integrity of the pipes and/or pavement shall be properly treated. <br />I . Ss ss I II I I <br />�� F.F. EL. 706.71 � I 4. Any removed and/or disturbed pavement, sidewalk, curb, etc., shall be replaced using the same type of material and CO STORM LOT Z I II _ _ - _ �I I I� brought back to its original grade and alignment. <br />r` G - I - -I <br />O� CLEAN OUT PdI- 3 �0 I I 5. No closing of streets shall be permitted without prior approval from the Municipality. <br />I I `rOo M I 20' Clear UNIT 2 Rim:705.58 I NIT 11 I II n <br />01st Fl. & Porch �� 1st FI. & Porch °� II I 6. Contractor shall take all necessary precautions to protect the work and safety of the public and provide, erect, and maintain <br />I 8 IE:702.58 I II all necessary <br />I I ST RM C-O I WS F.F. EL. 706.44 F.F. EL. 706.15 I II �2 I y barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices in accordance <br />I I Rim:705.87 I NS� with the Indiana Manual on Uniform Traffic Control Devices for Streets and Highways". <br />CS <br />8" IE:701.27 WS CS I STR. NO 10 Lnn co I II w o, <br />I I _ I � 7. Contractor shall obtain all necessary project permits form all respective governmental agencies with the exception of the <br />SS UNIT 1 \ j SS San MH ° • 0 Ln 1 _ II _ - - Soil Erosion Permit. The Developer will obtain this permit. <br />a Rim:704.11 0k\ _ I'- - <br />1st FI. & Porch \ � 1 1 + I ` 8. All backfill for pipe trenches and site grading shall be performed in 6-inch lifts maximum using suitable granular material <br />O11 1 F.F. EL. 706.29 \ I en I 8" IE (N):697.96 c CS L �I / � �� � and compacted to 100% Standard Proctor to proposed subgrade. Pipe bedding shall be in accordance with ASTM D-2321 <br />I 8 IE (E):697.86 ,. ��� for flexible and rigid pipe. Backfill material and compaction testing shall be reviewed and performed by a qualified <br />8" IE (W):696.30 • , . % :• �: - J geotechnical testing firm approved by the Architect/Engineer. <br />Cps �;P 1rZ 9. Contractor shall verify the water table and include in the bid the cost for dewatering. The water table shall be lowered to <br />PP PP/L <br />24 inches below the pipe invert prior to installation. <br />•�Oo C @ 1'75% co w/// 10. Water and sewer pipes shall have a minimum horizontal separation of 10 feet from edge of pipe to edge of pipe. Whenever <br />OH o n �' 80 LF 8„ SpP�c�< y Qf�l P p p 9 p p 9 p P <br />Ex. 12" Storm C (brick (asph.) C c EX• LP///� 16,E Watel Main W water pipes must cross above or below sewer pipes, a minimum vertical separation of 18 inches is required between the <br />< O -0 �j outside of the water pipe and the outside of the sewer pipe. If this cannot be met, the sewer pipe shall be constructed of <br />Ex. 15 Combined Sewer • % • i water grade pipe meeting AWWA Standards for a distance of 10 feet each side of the water pipe. At crossings, one full <br />8" DIP LINE "A"' length of water pipe shall be installed so that the joints will be as far from the sewer pipe as possible. <br />/ ow W W Ex. 16" Water Main W II W W H ••.+ • _ W _ WATER See Sheet C4.1 �, SAN• 11. Discrepancies or conflicts in the plans and/or site conditions shall be communicated to the General Contractor / Engineer to <br />cB II MAIN _ � /�� CLEAN -OUT ensure that clarifications and/or revisions can be made prior to construction. <br />- STR. NO 11 EX. SAN STR. NO. 1 , i ��� ��� l p <br />-Q-- --- -- - - - - ��� Rim:704.26 <br />F_ - - - - Ex. San. Service + : San MH _ Exist. San MIS . \ /ice ea 12. Coordinate utility connections to building with Architect. <br />� • � 8 IE W :699.26 <br />- - - - _ _ _ _ 47 LF 8 WATER \ i � i �� ( ) <br />- - - (F.V.Condition) Rim:704.88 Rim:703.81 <br />Ex. 15" IE W 695.05� WORKS GRADE 16"x16"x8" �� �i Z,.G° / %! <br />8" IE (N):698.00 ( )' 150 PSI <br />8" IE (SE):697.10 Prop. 8" IE (NW): 696.95 PRESSURE TAPPING \�� / o ��� /���� / j% / <br />LEEVE STORM SEWER NOTES <br />I <br />I <br />Line Trench Top, Sides & Bottom Finished Grade <br />w/Non-Woven Geotextile PROPEX 4545 <br />or Approved Equal; Provide 18" Overlap Parking Lot Pavement Section <br />At All Fabric Joints 24" Dia. Perforated ADS N-12 Pipe <br />-``-��--�mac _ �c �v,__�� <br />Note <br />Prop. 8" IE (E): 695.50 5 <br />RATED PIPE & VALVE EX. STORM �� / \dt. SQr��� �' 1. Storm pipe 12" and smaller shall be SDR 35 PVC OR ADS N-12 HDPE unless noted otherwise. Storm pipe 15" and larger <br />MEETING - - �� P�ai' shall be ADS N-12 HDPE or C76 CL-III RCP unless noted otherwise. <br />STR. NO. 1 <br />AWWA STDS. N� \ �v Exist. Storm MH / /�5� / /i 2. Storm pipe with cover less than two (2) feet below pavement shall be RCP CL-III. <br />Rim:703.60 / / / // <br />� \ \ / � / � � 3. Pipe shall conform to ASTM C-478 standards. Pipe shall be bedded per pipe manufacturer, and backfilled with suitable <br />/ // clean granular material in accordance with the plans, see pipe trench detail. <br />4. Storm pipe shall maintain 10'-0" minimum horizontal and 18" minimum vertical separation between potable water pipes. <br />/ 0111 � / // � � � / 5. Roof downspouts storm piping: Prior to construction, Contractor shall review Architectural Drawings accounting for all <br />LPG II 0 Z / i downspouts. Downspout storm piping shall be intercepted and connected to the storm sewer. Provide all necessary <br />/ piping, fittings, and transition adapters to connect downspout piping to the storm sewer. See Construction Details for <br />Downspout Connection Typical Detail. <br />Z 6. CASTINGS <br />Flat Inlet Casting: Neenah R-2502 <br />5-0, 4-Z! D�� Ln Contractor shall ensure all eotextile fabric surrounding pipe, overlaps and joints are properly <br />9 9 p�p � p J p p Y <br />36" IE:699.80 installed to create a barrier from soil infiltration. <br />Contact Engineer if topsoil, organic, clay, or low permeable material is encountered <br />excavation. <br />5'-6" 5'-6" <br />13' AGGREGATE TRENCH DETAIL <br />(Not To Scale) <br />GRAPHIC SCALE Solid Casting: Neenah R-1642 <br />1 1 1 zo 40 Neenah castings specified. Approved equal to specified Neenah Foundry Co. castings may be acceptable if approved by <br />Owner. Contractor to submit casting cut sheets to Owner for review. <br />( IN FEET) 8. Storm sewer open grate castings shall be stamped with a fish image and the message: "DUMP NO WASTE - DRAINS TO <br />1 inch = 20 ft. WATERWAYS." Solid flat castings shall be stamped with the message "STORM". <br />NOT FOR PRICING <br />NOT FOR CONSTRUCTION <br />FOR REVIEW ONLY <br />1.0 <br />_a <br />0 ooaa <br />o a oe <br />as £aa <br />av <br />V <br />>=hoe <br />o <br />a <br />o t3 <br />E ' o <br />.0 vc9 ° ° <br />Z <br />0 <br />a <br />a <br />Q�o <br />m°o E <br />c v O <br />" Z C G <br />2 <br />E <br />1, <br />� ^'fLa <br />uNN <br />uOr- <br />p <br />.0M VI�� 0 <br />H <br />Z <br />W <br />�OWa <br />L <br />OZ <br />Lm <br />g <br />V>�o <br />LJJ <br />Z z <br />ZaQz <br />O <br />J <br />m <br />A/ <br />W <br />30 <br />Z <br />W <br />W <br />a <br />ii <br />Q <br />IL <br />W <br />J <br />H <br />w <br />J <br />w <br />LLJ <br />ul <br />DRAWN BY: <br />Ni <br />DESIGNED BY: <br />DSK <br />PM REVIEW: <br />SDR <br />QA/QC REVIEW: <br />DSK <br />DATE: <br />05/13/2025 <br />SEAL: <br />\STER�o <br />:No. PE 19900163i <br />• STATE OF Q <br />SIGNATURE: <br />DATE: V <br />05/13/2025 <br />SCALE: <br />1"=20' <br />ACI JOB # <br />24-1420 <br />SHEET NO. <br />C4.0 <br />NO. I REVISION DESCRIPTION: <br />BY: I DATE: <br />