My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDIANA <br />0 EARTH <br />INC. <br />Page 1 of 2 <br />February 5, 2025 <br />To: Larson -Danielson Construction <br />RE: Raclin Murphy CCD 1 <br />Please see below for Indiana Earth's revised pricing for the alternate location for the Storz <br />Connection. <br />• We will start at the building and work our way out. Starting from the riser pipe in the <br />building and excavating for utility trench to install pipe/fittings required to make Fire <br />Department Connection as noted on revised sheet C2.0 dated 6-21/2024 <br />• Extra fittings will be required to duck under duct bank and come back up <br />• Concrete thrust blocks will be utilized per City of South Bend <br />• Flowable Fill will be utilized for initial backfill <br />• Install 4" x 2.5" x 2.5" Fire Department Connection to match the current Fire <br />Department Connection style at the Performing Arts Center <br />Materials <br />• <br />3 sticks of 4" Ductile <br />• <br />Riser Pipes <br />• <br />4-4"90's <br />• <br />Mega Lugs <br />• <br />1- 4" Galvanized Street 90 <br />• <br />5' of 4" Galvanized Pipe <br />• <br />2 Flange Kits <br />• <br />Thrust Blocks <br />• <br />Flowable Fill <br />Labor <br />• 135 Exc @ $200 per Hr for 16 Hrs <br />• 2 Laborers @ $160 per Hr for 16 Hrs <br />• Loader @ $210 per Hr for 8 Hrs <br />• Traffic Control is done by others <br />• Utilizing a 135 Exc, Loader, & 2laborers <br />• It will take Indiana Earth 2 days to do this work <br />2,000 <br />1,500 <br />700 <br />600 <br />500 <br />600 <br />500 <br />525 <br />1,500 <br />3,200 <br />2,560 <br />1,680 <br />Grand Total: $15,865 <br />10343 McKinley Hwy. • Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480 <br />
The URL can be used to link to this page
Your browser does not support the video tag.