Laserfiche WebLink
ELECTRICAL a TECHNOLOGIES <br />FULL SERVICE CONTRACTOR <br />CHANGE NOTICE <br />CCN# 14 <br />Date: 4/182025 <br />Project Name: Raclin -Murphy Morris Addition <br />Page Number: 1 <br />We reserve the right to correct this quote for errors and omissions. <br />This quote wvers direct costs only and we reserve the right to claim for impact and consequential costs. <br />This price is good for acceptance within 30 days fmm the date of receipt. <br />We will supply and install all materials, labor, and equipment as per your instructions on BLACKJACK LIGHTING OPT 1. <br />Itemized Breakdown <br />Description <br />Qty Net Cost <br />Labort) Total Mat. Total Hrs. <br />ADDITIONAL PENDANTS TO <br />BLACKJACK 1 0.00E <br />60.00E 0.00 60.00 <br />Totals <br />1 <br />0.00 60.00 <br />Summary <br />LIGHTING FIXTURES <br />248,202.00 <br />Total Material <br />248,202.00 <br />FOREMAN <br />(30.00 Hrs @ $84.64) <br />2,639.20 <br />APPRENTICE <br />(30.00 Hrs @ $67.35) <br />2,020.50 <br />Labor Overhead <br />(@ 10.000 %) <br />455.97 <br />Subtotal <br />253,217.67 <br />Markup <br />(@ 10.000 %) <br />25,321.77 <br />Subtotal <br />278,539.44 <br />Final Amount $278,539.44 <br />ORIGINAL <br />