Laserfiche WebLink
10LARSON <br />DMA 411; LSON <br />ComDuc[ivn Carq'wry, Inc. <br />To: Matt Puckett <br />SHIVE-HATTERY <br />321 SOUTH MAIN STREET, <br />SUITE 103 <br />SOUTH BEND, IN 46601 <br />Ph:(574)307-9990 <br />Description: ASI 11 Natural Gas Piping Routing <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Change Request <br />Number: 36 <br />Date: 5/15/25 <br />Job: 56-702 SIB PUB WRKS-RCLN MRPHY ENCORE <br />Phone: <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />P-101 - Plumbing First Level Plan <br />a. Revise: Gas piping to enter the building at 1st level in lieu of routing up the exterior wall. <br />b. Route main line to rise, refer to detail 3, sheet P-401 for continuation. <br />c. Revise: Keynote #4 for routing conditions. <br />P-102 - Plumbing Second Level Plan <br />a. Revise: Gas routing near columns B & 2.4. <br />P-401 - Plumbing Enlarged Plan <br />a. Revise: Detail 5 to show revised gas piping at DWH-1. <br />b. Remove: Gas piping that was shown coming from the exterior wall shown on detail 5. <br />Description Labor <br />Material Equipment <br />Subcontract <br />Other <br />Price <br />ASI 11 Natural Gas Piping Routing <br />$2,105.00 <br />$2,105.00 <br />Subtotal: <br />$2,105.00 <br />OH&P Labor <br />$0.00 <br />OH&P Material <br />$0.00 <br />OH&P Equipment <br />$0.00 <br />Subcontractor First 3K <br />$2,105.00 <br />10.02% <br />$211.00 <br />Subcontractor After 3K <br />$0.00 <br />Bond Markup <br />$2,316.00 <br />0.99% <br />$23.00 <br />Total: <br />$2,339.00 <br />If you have any questions, please contact me at (219)575-6115. <br />Submitted by: David J. Merkel <br />LARSON-DANIELSON CONST. CO INC <br />Approved by: <br />Date: <br />Page 1 of 1 <br />