Laserfiche WebLink
ELECTRICAL & TECHNOLOGIES <br />FULL SERVICE CONTRACTOR <br />CHANGE NOTICE <br />CCN # <br />5 <br />Date: <br />3142025 <br />Project Name: <br />Raclin -Murphy Moms Addition <br />Page Number: <br />1 <br />Work Description <br />We reserve the right to correct this quote for errors and omissions. <br />This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. <br />This price Is good for acceptance within 30 days from the date of receipt. <br />We request a time extension of 7 days. <br />We will supply and install all materials, labor, and equipment for Re -Feed Electric to Fountain. <br />Itemized Breakdown <br />Description <br />Qty <br />Net Cost <br />LaborU <br />Total Mat.Total HIS. <br />CTCABINET <br />1 <br />1,000.00E <br />6.25E <br />1,000.00 <br />6.25 <br />4 x 6" NIPPLE - RMC - GALV <br />2 <br />3,027.02 C <br />122.50 C <br />60.54 <br />2.45 <br />3" LOCKNUT-STEEL <br />8 <br />100.07C <br />12.25C <br />8.01 <br />0.98 <br />4" LOCKNUT-STEEL <br />8 <br />344.64C <br />15.75C <br />27.57 <br />1.26 <br />4" BUSHING -PLASTIC <br />4 <br />116.00C <br />13.50C <br />4.64 <br />0.54 <br />3" CONDUIT -PVG40 <br />260 <br />205.47C <br />12.25C <br />534.22 <br />31.85 <br />3" ELBOW 90 DEG - PVC40 <br />8 <br />492.40 C <br />85.00 C <br />39.39 <br />6.80 <br />3" COUPLING - PVC <br />8 <br />112.80 C <br />6.00 C <br />9.02 <br />0.48 <br />3" ADAPTER MALE - PVC <br />8 <br />189.20 C <br />35.00 C <br />15.14 <br />2.80 <br />#2 THHN BLACK <br />290 <br />1,630.19M <br />15.50M <br />472.76 <br />4.50 <br />#410 THHN BLACK <br />1,160 <br />4,428.06M <br />27.00M <br />5,136.55 <br />31.32 <br />CONDUIT MEASURING TAPE <br />260 <br />28.59M <br />3.75M <br />7.43 <br />0.97 <br />12x 8x 8"WP FLNG J-BOX W/SIDEWALK CVR <br />1 <br />350.00E <br />3.13E <br />350.00 <br />3.13 <br />1 5/8x 1 5/8x 14G STRUT GALV <br />4 <br />253.48 C <br />12.50 C <br />10.14 <br />0.50 <br />3/8-16x 1 5/Bx 2 7/16 OR 3 1/4 SPRING NUT <br />4 <br />67.17 C <br />5.00 C <br />2.69 <br />0.20 <br />3/8-16x 1 12 HEX HEAD BOLT - PLTD STL <br />4 <br />10.76 C <br />&75 C <br />0.43 <br />0.23 <br />3/8x 1 1/4 FENDER WASHER - PLTD STL <br />8 <br />8.63 C <br />1.25 C <br />0.71 <br />0.10 <br />3/8x4 TGL BOLT SPRING WING P/H <br />4 <br />161.64C <br />15.00C <br />6.47 <br />0.60 <br /># 2 WIRE POWER TERM <br />4 <br />0.00E <br />0.31E <br />0.00 <br />1.24 <br />#410 WIRE POWER TERM <br />16 <br />0.00 E <br />0.54 E <br />0.00 <br />8.64 <br />BOLLARD DEMO <br />4 <br />0.00 E <br />2.00 E <br />0.00 <br />8.00 <br />Totals <br />2,066 <br />7,685.70 <br />112.84 <br />Summary <br />General Materials <br />7,685.70 <br />Total Material <br />7,635.70 <br />FOREMAN (112.84 Hire @ $84.64) <br />9,550.78 <br />BACKHOE (per Week) (1.00 @ 1.00 @ $1,500.00 + 0.000 %+0.000 <br />%+0.000 %) <br />1,500.00 <br />Subtotal <br />18,736.48 <br />Overhead (@ 10.000 %) <br />1,873.65 <br />Markup (@ 10.000 %) <br />2,061.01 <br />ORIGINAL <br />