My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KLECKNER <br />INTERIOR <br />.SYSTEMS <br />est. 1989 INC. <br />Kleckner Interior Systems, Inc. <br />1176 Domon Lane <br />Chesterton, IN 46304 <br />219-787-8876 phone <br />219-787-8896fax <br />REQUEST FOR CHANGE ORDER <br />Job Name: Raclin Murphy Date: March 18th, 2025 <br />South Bend, IN <br />Descripition of work: Stretch Fabric <br />Provide labor and materials as it relates to our scope of work. Pricing includes value engineering related to <br />changing the stretch fabric system to 2" in lieu of 3-1/2" system as specified. The system specified does <br />not come in 3-1/2" it is only made in 1" or 2". To get to the depth of 3-1/2" blocking would need to be added. <br />The blocking would require to be wrapped in fabric as well. This would make it difficult to change fabric in <br />the future. The pricing is to go with a 2" Novawall Stretch Fabric System. Pricing includes work associated with <br />RFI #89 plywood blocking attached to suspended drywall grid with drywall ceilings where new lights are to be <br />installed at acoustical sound panels as indicated. <br />Total <br />Total Material Deduct = ($1,500.00) <br />Total Labor Deduct = ($8,500.00) <br />Total Material Add = $1,600.00 <br />Total Labor Add = $1,760.00 <br />Total Equipment/Lifts = $0 00 <br />Total Sum = <br />($6,640.00) <br />OHP = <br />$0.00 <br />Total = <br />($6,640.00) <br />Bonding = <br />$0.00 <br />Total Cost = <br />($6,640.00) <br />Written: Kleckner Interior Systems, Inc. <br />Joshua E. Howard <br />Project Manager/Safety Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.