My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Text box
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
http://www.rlbinsulation.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HONDY I.; INSULATIOANTM <br />3371 W. Cleveland Rd. Suite 214 • South Bend, IN 46628 • 574-520-1120 • CELL: 269-240-0206 <br />The insulation proposal above is for new work and tie-ins only and EXCLUDES the following items: <br />1. Paint or Pipe I.D. <br />2. Dumpster for waste. Owner Provided. <br />3. Temporary lighting. Owner Provided. <br />4. Performance Bond <br />5. Safety person <br />6. Break trailer / Toilet facilities <br />7. Temporary power at work area. Owner Provided. <br />8. Existing piping is excluded. <br />9. Grease Duct is Excluded. <br />10. Exhaust Duct is excluded. <br />ACCEPTANCE: This proposal is offered for performance of the work on a lump sum basis. Our proposal <br />is based on provided drawing and supplied footages. <br />PRICE SCHEDULE: The pricing breakdowns identified in the pricing schedule are informational <br />only and, unless identified as optional pricing or add/deduct alternates, are not offered for <br />acceptance of award of less than the entire work scope. <br />Base Bid: CCD 004 <br />Sink: <br />Domestic Water: $ 827.00 <br />- Labor: $ 605.00 <br />- Materials: $ 222.00 <br />HVAC Ductwork: $ 3,955.00 <br />- Labor: $ 2,524.00 <br />- Materials: $ 1,431.00 <br />Total: $ 4,782.00 <br />SCHEDULE: Our schedule is dependent on the successful completion and testing of the <br />specified work. All work quoted is on a 40 Hour, 5 — Eight work Schedule. <br />Bondy expects intermediate releases of specified work following the installation start milestones <br />sufficient to allow completion of our work within the planned durations without significant changes in <br />man loading requirements. <br />www.rlbinsulation.com www.macombgroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.