My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Morris Sheet Metal <br />109 Garst Street <br />South Bend, IN 46601 <br />260-497-1300 <br />Morris Sheet Metal <br />CHANGE ORDER QUOTATION <br />EXCLUSIONS: <br />• External ductwrap insulation <br />• Double wall ductwork <br />• Lift equipment <br />• Painting of ductwork exterior or associated air devices <br />• Air test or balance <br />• Fire, Fire/Smoke, and Smoke dampers not shown on drawings <br />• Bonds, permits or fees <br />• Sales tax <br />CLARIFICATIONS: <br />• This quote is figured to provide and install single wall ductwork. <br />Note 6 (double wall ductwork) was taken off of the new drawings <br />Respectfully, <br />Jason Wilfing <br />Morris Sheet Metal <br />109 Garst Street, South Bend, IN 46601 <br />Cell: 574-876-7719 Email: jwilfing@morrissheetmetal.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.