My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Callout
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
is the above and below because of the baffle ceiling. If so does the spacing or depth necessitate the additional heads.?
Text box
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
To answer the owner’s question on the attached quote: -Yes, the above and below sprinkler head coverage in the Equity of the Arts area is because of the baffle ceiling. -It is both the spacing and the depth of the baffle ceiling that necessitates the additional heads. We had RFI #106 which addressed this previously. I have also attached the baffle criteria we had sent along previously which explains the rule for baffle ceilings and sprinkler heads.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
u <br />1rJW <br />THE HILL GROUP <br />Change Order Request <br />1104: GAGE AVE NVE <br />FRAN a IN PAR K. 1L 80131 <br />P 047 288.5100 F 885.434 6595 <br />www h11F9rP."M <br />To: Larson -Danielson Job Name: Raclin -Murphy Encore Center Project Manager: Brandon Pavlina <br />302 Tyler Street Address: 211 N Michigan Street, South Bend, IN 46601 <br />LaPorte, IN 46350 Job Number: 33267 Date: 3/10/2025 <br />COR # 2 <br />We are pleased to submit this proposal to perform extra work on the above referenced project. Listed below is a description of the work included and a breakdown <br />of pricing for your review. Proposed Change Order Scope and Pricing does not include any additional costs associated with unforeseen conditions, unanticipated <br />acceleration, trade stacking, delay caused by others, or cost escalation due to delay caused by Contractor, Owner or Architect. If directed to proceed and <br />unanticipated conditions, delays or factors noted are encountered, Subcontractor will notify Contractor. <br />Description of Work: <br />• CCD 4 Equity of the Arts <br />• Furnish and install (2) new upright sprinkler heads per the new layout in the northwest corner of the 1 st Floor. <br />• Provide above and below sprinkler coverage in the new Equity of the Arts area by furnishing and installing approximately (9) pendant sprinkler heads. <br />• Redesign, verify pipe sizing, revised fabrication drawings, coordination for new layout and revision to Equity of the Arts area. <br />Pricing Breakdown: <br />Material / Equipment / Design $ 4,738.74 <br />Labor $ 3,226.79 <br />Subcontracts $ - <br />Bond $ <br />Please issue a change order accordingly. <br />Hill Fire Protection <br />Brandon Pavlina <br />Project Manager <br />Title <br />Accepted by: <br />Name <br />Company <br />Title <br />Date: <br />Total: $ 7,966.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.