Laserfiche WebLink
"LARSON <br />D1A Q FLSON <br />ConvDuctioâ–ºr Ganj ury, Inc. <br />To: Matt Puckett <br />SHIVE-HATTERY <br />321 SOUTH MAIN STREET, <br />SUITE 103 <br />SOUTH BEND, IN 46601 <br />Ph:(574)307-9990 <br />Description: CCD 3 High GFRC Cornice to Coping <br />Source: CCD # 3 <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Change Request <br />Number: 8R <br />Date: 1 /9/25 <br />Job: 56-702 SIB PUB WRKS-RCLN MRPHY ENCORE <br />Phone: <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />Revise the detailing of the high cornice, remove GFRC high cornice and replace with standard metal coping see sheet A200, A353. <br />REVISION: This price is resolved to not include the 2 different textures. <br />Description Labor Material Equipment Subcontract Other Price <br />Additional Terra Cotta $40,000.00 $40,000.00 <br />Roofing $6,480.00 $6,480.00 <br />Drywall $-32,958.00 $-32,958.00 <br />L-D Reduction Based on Scheduling $-13,522.00 $-13,522.00 <br />Simplification <br />If you have any questions, please contact me at (219)575-6115. <br />Submitted by: David J. Merkel <br />LARSON-DANIELSON CONST. CO INC <br />Subtotal: $0.00 <br />OH&P Labor <br />$0.00 <br />OH&P Material <br />$0.00 <br />OH&P Equipment <br />$0.00 <br />Subcontractor First 3K <br />$0.00 <br />Subcontractor After 3K <br />$0.00 <br />Bond Markup <br />$0.00 <br />Total: $0.00 <br />Approved by: <br />Date: <br />Page 1 of 1 <br />