My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE NOTICE CCN# <br />10 <br />Project Name: <br />Raclin -Murphy <br />Morris Addition <br />Page Number: <br />2 <br />Description <br />Qty <br />Net Cost <br />LaborU <br />Total Mat. <br />Total Hrs. <br />4" SO IG PLSTR RING 5/8"RISE <br />14 <br />86.00C <br />3.13C <br />12.04 <br />0.44 <br />4" SO BLANK COVER <br />20 <br />51.00 C <br />3.13 C <br />10.20 <br />0.63 <br />3G CONCENTRIC KO BOX <br />2 <br />2,303.00 C <br />32.50 C <br />46.06 <br />0.65 <br />3G BOX DEVICE COVER 3/4" RISE <br />2 <br />1,501.58 C <br />4.38 C <br />30.03 <br />0.09 <br />GROUND SCREW W/INSUL#12 LEAD <br />16 <br />1,101.24C <br />3.75C <br />176.20 <br />0.60 <br />114-20X 1 314 WEDGE ANCHOR - 1 1/8" MIN DEPTH <br />63 <br />30.72 C <br />10.00 C <br />19.35 <br />6.30 <br />#12 SINGLE JACK CHAIN <br />6 <br />282.10M <br />6.25M <br />1.69 <br />0.04 <br />#11 S-HOOK <br />4 <br />10.36 C <br />6.25 C <br />0.41 <br />0.25 <br />#10x 1 P/H SELF -TAP SCREW <br />6 <br />0.05 C <br />3.76 C <br />0.00 <br />0.23 <br />#Bx 1/2 WAFER HEAD SELF -TAP STUD SCREW - <br />40 <br />2.92 C <br />3.00 C <br />1.17 <br />1.20 <br />C-PURLIN CLIP <br />2 <br />98.97 C <br />7.50 C <br />1.94 <br />0.15 <br />C-PURLIN CLIP W/#8-1/4 HNGR <br />20 <br />205.16C <br />8.75C <br />41.03 <br />1.75 <br />#8x 12 WAFER HEAD SHEET MTL SCREW <br />70 <br />13.53 C <br />1.88 C <br />9.47 <br />1.32 <br />1 m x 2mm SPEED LINK CABLE <br />8 <br />3.07E <br />0.20E <br />24.56 <br />1.60 <br />#12CEILINGWIRE <br />36 <br />20.000 <br />2.50C <br />7.20 <br />0.90 <br />3G TGL SWITCH PLATE -PLASTIC IVY <br />2 <br />121.000 <br />7.50C <br />2.42 <br />0.15 <br />1G DUPLEX REC PLATE- PLASTIC IVY <br />13 <br />123.31 C <br />3.38 C <br />16.03 <br />0.44 <br />1 G DECORATOR PLATE -PLASTIC IVY <br />1 <br />256.58C <br />3.75C <br />2.57 <br />0.04 <br />3-Btn LV Chl On/Off w/ Preset - Bilk <br />2 <br />0.00 C <br />25.00 C <br />0.00 <br />0.50 <br />20A 125V DUP REC - IVY (SG) <br />13 <br />753.00 C <br />25.00 C <br />97.89 <br />3.25 <br />20A 125V DUP REC TR - GFCI IVY W/ IND LIGHT <br />1 <br />3,967.00 C <br />31.25 C <br />39.67 <br />0.31 <br />ACCENT TRACK FIXT <br />23 <br />0.00 E <br />0.50 E <br />0.00 <br />11.50 <br />PENDANT SPEAKERS <br />4 <br />320.00 E <br />1.00 E <br />1.280.00 <br />4.00 <br />BERKTEKCABLE <br />6,000 <br />0.45E <br />0.00E <br />2,700.00 <br />0.00 <br />PANDUIT JACKS <br />40 <br />15.00 E <br />0.25 E <br />600.00 <br />10.00 <br />PANDUIT FACEPLATES <br />17 <br />4.25 E <br />0.00 E <br />72.25 <br />0.00 <br />SPEAKER CABLE <br />1,000 <br />26.20 C <br />8.00 M <br />262.00 <br />8.00 <br />PROVIDE SCREEN <br />1 <br />450.00E <br />0.00E <br />450.00 <br />0.00 <br />PANASONIC PROJECTOR <br />1 <br />4,500.00 E <br />16.00 E <br />4,600.00 <br />16.00 <br />MOUNTING HARDWARE <br />1 <br />200.00E <br />2.00E <br />200.00 <br />2.00 <br />PULL DATA CABLES <br />1 <br />0.00 E <br />18.00 E <br />0.00 <br />18.00 <br />MOUNT APs <br />3 <br />0.00 E <br />1.00 E <br />0.00 <br />3.00 <br />TEST CATS CABLE <br />20 <br />0.00 E <br />20.00 C <br />0.00 <br />4.00 <br />Totals <br />12,459 <br />12,860.52 <br />274.59 <br />DEDUCTS <br />Description <br />Qty <br />Net Cost U <br />Labor U <br />Total Mat. <br />Total Hrs. <br />4" CONDUIT -EMT <br />-133 <br />715.50C <br />17.13C <br />-951.62 <br />-22.78 <br />4" CONN SS STL - EMT <br />-2 <br />996.15 C <br />45.00 C <br />-19.92 <br />-0.90 <br />4" COUPLING SS STL-EMT - <br />-13 <br />686.96C <br />21.25C <br />-86.70 <br />-2.76 <br />4" BUSHING -PLASTIC <br />-2 <br />116.000 <br />13.50C <br />-2.32 <br />-0.27 <br />4" SPRING STL CONDUIT CLAMP W/ BOLT <br />-14 <br />201.03C <br />25.00C <br />-28.14 <br />-3.50 <br />1/4-20x 12 HEX HEAD BOLT- PLTD STL <br />-14 <br />2.81 C <br />3.75 C <br />-0.39 <br />-0.53 <br />1/4-20 HEX NUT - PLTD STL <br />-14 <br />1.62 C <br />2.50 C <br />-0.23 <br />-0.35 <br />BEAM CLAMP TO 5/8" FLNG W/ 1/4-20 THRD HOLE <br />-14 <br />99.72 C <br />10.00 C <br />-13.96 <br />-1.40 <br />Totals <br />-206 <br />-1,103.29 <br />-32.49 <br />Summary <br />General Matenals <br />11,757.23 <br />GRAYBAR OUOTATION (attached) <br />14,071.79 <br />Total Material <br />25,829.02 <br />FOREMAN (121.05 <br />Hrs @ $84.64) <br />10,245.67 <br />JOURNEYMAN (121.05 <br />Hrs @ $76.34) <br />9,240.96 <br />Subtotal <br />45,315.65 <br />Overhead (@ 10.000 %) <br />- <br />4,531.57 <br />Markup (@ 10.000 %) <br />4,984.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.