My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Polygon
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Main Office <br />440 Sullivan Street <br />Hobart, Indiana 46342 <br />(21.9)9424766 <br />Fax (219)942-7428 <br />fA <br />1821 Clover Road, Suite 1 <br />Mishawaka, hidiana.46545 <br />(574)259-1558 <br />Fax (574)_259,,4 559 <br />www.stmn painting.com <br />To: Larson Danielson Construction February 28 2025 <br />302 Tyler Street (Revised 4121125) <br />LaPorte, IN 46350 <br />Re: Raclin. Murphy Encore Center - CCD #4 <br />SCE <br />Storage 108 <br />-Less di ywaft watt painting due to reduction in size of room. <br />C ice 104 <br />-Add drywall wall painting entire room. Was previously Catering Prep with f4ll.FRP on walls. <br />Corridor 10 <br />-Add drywalf wall and drywall ceiling painting entire room. Was previously Catering: Prep. <br />Corridor 103' <br />-Minor adjustments to drywall wail, drywall ceiling & painted wood base quantities. <br />Equity 102 <br />-Add paint drywall walls 2 colors - wall color up to bottom of baffle elevation then exposed ceiling <br />color from there up to deck. <br />-Add paint wood base. <br />-.Add mask room + paint exposed ceiling deck/structure and pipes, conduits & ducts within exposed ceiling <br />using 1 coat waterbased flat dryfatt all in one color (SW 7976 Cyberspace). <br />-Excludes painting MEP/F devices (diffusers, lighting components, speaker covers, etc) <br />-Excludes painting hangars for lighting and baffles. <br />Credit for Storage 108: ($ 142.00) <br />Add for all other changes: $1.0,782.00 <br />Total Painting Add: $10,640.00 <br />Robert Hendrickson <br />Estimator <br />
The URL can be used to link to this page
Your browser does not support the video tag.