Laserfiche WebLink
- Protection of surrounding area, and final clean-up. <br />- Traffic/safety control. <br />-Work to be performed by union employees from outside the local union area. If additional workers are needed to to meet <br />local union requirements they are to be paid for by others. <br />Price Based on the following conditions unless otherwise stated: <br />- Concrete reinforcement based upon normal re -steel. <br />- Work to be performed in a continuous manner, during standard work week hours. <br />- Work area must be free of all obstructions prior to scheduled arrival. <br />- Air temperatures above 32 degrees F. <br />- No concrete removal. <br />- No handling or saw cutting of hazardous material (IE lead based paint, asbestos, etc.) <br />- Upon completion of cutting operations C.C.B. will no longer be responsible for job site silica dust. <br />Price good for 60 days and is subject to change if conditions vary from this quotation. <br />- Term: 30 days for approved accounts. <br />Date <br />Bret Hollenbeck <br />breth@concut.com <br />Date <br />Proposal Accepted By: <br />