Laserfiche WebLink
jA�er�6-qv <br />V_ OW& <br />ELECTRICAL & TECHNOLOGIES <br />FULL SERVICE CONTRACTOR <br />CHANGE NOTICE <br />CCN# <br />6 <br />Date; <br />121/2025 <br />Project Name: <br />Radin-Murphy Morris Addition <br />Page Number: <br />1 <br />Work Description <br />We reserve the right to correct this quote for errors and omissions. <br />This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. <br />This price is good for acceptance within 30 days from the date of receipt. <br />We will supply and install all materials, labor, and equipment as per your instructions on CCD 9 - SUMP PUMP. <br />Itemized Breakdown <br />Description <br />Oty Trade Price U <br />Labor U <br />Total Mat.Total Hire. <br />3X'CONDUIT-EMT <br />30 <br />73.91C <br />4.000 <br />22.17 <br />1.20 <br />3X'CONN SS STL - EMT <br />2 <br />29.90C <br />12.50C <br />0.60 <br />0.25 <br />3/4"COUPLING SS STL - EMT <br />3 <br />36.90C <br />5.00C <br />1.11 <br />0.15 <br />112" BUSHING GRDG INSUL 150 DEG -STEEL <br />2 <br />500.88 C <br />2.63 C <br />10.02 <br />0.05 <br />314" 1-H STRAP - EMT - STEEL <br />4 <br />14.20 C <br />6.75 C <br />0.57 <br />0.27 <br />1/2"FLEX - LIQUIDTIGHT METALLIC - GRAY <br />3 <br />158.01C <br />4.88C <br />4.74 <br />0.15 <br />1/2"CONN STRAIGHT- LIQUIDTIGHT DIECAST <br />2 <br />248.00C <br />18.75C <br />4.96 <br />0.38 <br />#10 THHN BLACK <br />99 <br />228.76M <br />7.06M <br />22.65 <br />0.70 <br />WIRE CONN RED <br />3 <br />21.13C <br />7.50C <br />0.63 <br />0.23 <br />WIRE CONN RED (#16TO#10) <br />3 <br />21.13C <br />8.75C <br />0.63 <br />0.26 <br />4x 1 112" SO BOX COMB KO <br />1 <br />119.36 C <br />28.75 C <br />1.19 <br />0.29 <br />4" SQ BLANK COVER <br />1 <br />43.71 C <br />3.13 C <br />0.44 <br />0.03 <br />98 TO #10x 7/8 PLAS ANCHOR (3116) <br />6 <br />46.55 C <br />7.50 C <br />2.79 <br />0.45 <br />#10x 1 P/H SELF -TAP SCREW <br />6 <br />0.05 C <br />3.75 C <br />0.00 <br />0.23 <br />20A IF BREAKER BOLT -ON <br />1 <br />14.03 E <br />0.19E <br />14.03 <br />0.19 <br />#12/2C+GRID MOTOR TERM <br />1 <br />0.00E <br />0.61E <br />0.00 <br />0.61 <br />Totals <br />167 <br />86.54 <br />5.42 <br />Summary <br />General Materials <br />86.54 <br />Total Material <br />$6.54 <br />FOREMAN (5.42 Him @ $89.00) <br />482.38 <br />Subtotal - <br />568.92 <br />Overhead (0 10.000 %) <br />56.89 <br />Markup (@ 10.000 %) <br />62.58 <br />Subtotal 688.39 <br />Final Amount $688.39 <br />ORIGINAL <br />