Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Patrick Sherman: Director of Project Management <br />SUBJECT: Raclin Murphy Encore Center: Change Order #3 <br />DATE: June 10t", 2025 <br />Greetings, <br />The documents herein detail the costs associated with Change Order #3 for the Raclin Murphy <br />Encore Center project. This includes a variety of costs associated with the project including <br />items required by the building and fire departments, necessary design adjustments, and owner <br />items, the largest of which is the addition of the Equity in the Arts Programming space. <br />CCD 2 Utility Routing <br />CCD 3 High GFRC Cornice to Coping <br />CCD 1 ASI 1 FDC and Storz Connection <br />Site Camera <br />Fire Alarm Panel Change <br />2-Tone Curtain Wall/Storefront <br />$0.00 <br />$0.00 <br />$26,203.00 <br />$4,510.00 <br />$1,000.00 <br />$9,277.00 <br />Acoustic Panel Insulation Thickness (Deduct - RFI)-$6,640.00 <br />Modification to Large Light Fixtures $0.00 <br />CCD 10R1 Flooring and Paint Finishes <br />CCD 7 Ceiling Layout <br />CCD 9 Sump Pump <br />CCD 12 Site Electrical <br />CCD 4 Equity in the Arts <br />ASI 11 Natural Gas Piping Routing <br />$1,762.00 <br />$0.00 <br />$18,968.00 <br />$24,591.00 <br />$249,156.00 <br />$2,339.00 <br />Total $331,166.00 <br />Thank you and please let me know if you have any questions. <br />Patrick Sherman <br />