Laserfiche WebLink
0;�er�tw-v <br />ELECTRICAL & TECHNOLOGIES <br />FULL SERVICE CONTRACTOR <br />CHANGE NOTICE <br />CCN# <br />7 <br />Date: <br />2W025 - <br />Project Name: <br />Radin-Murphy Morris Addition <br />Page Number: <br />1 <br />Work Description <br />We reserve the right to correct this quote for errors and omissions. <br />This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. <br />This price is good for acceptance within 31) days from the date of receipt. <br />We will supply and install all materials, labor, and equipment as per your instructions on Install Camera & Troubleshoot Camera. <br />Itemized Breakdown <br />Description City Trade Price LaborU <br />Total Mat Total HIS. <br />INSTALL CAMERA 1 0.00 E 4.00 E <br />0.00 <br />4.00 <br />TROUBLESHOOT CAMERA 1 0.00E 3.50E <br />0.00 <br />3.50 <br />Totals 2 <br />0.00 <br />7.50 <br />Summary <br />FOREMAN (7.50 Him @ $89.13) <br />668.48 <br />BUCKET TRUCK (per Hour) (7.50 @ 0.00 @ $45.00 + 0.000 %+ 0.000 %+ 0.000 %) <br />337.50 <br />Subtotal <br />1,005.98 <br />Overhead (@ 10.000 %) <br />100.60 <br />Markup (@ 10.000 %) <br />110.66 <br />Subtotal 1,217.24 <br />Final Amount $1,217.24 <br />ORIGINAL <br />