Laserfiche WebLink
10LARSON <br />DIAN [ E LSON <br />C'r�ra►•rr7u •trrlyr C_ ��nr�arrr? ti; liar. <br />Request for Quote <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />To: HILL FIRE PROTECTION Date: 10/11/2024 <br />11045 GAGE AVENUE Due Date: 10/16/2024 <br />FRANKLIN PARK, IL 60131 RE: Change Request 9 <br />Ph: (847)288-5100 Fax: (866)434-6595 Job: 56-702 SIB PUB WRKS-RCLN MRPHY ENCORE <br />Contract: 56702-006 Fire Protection <br />Please review the proposed scope of work outlined below and forward the cost/credit and comments to my attention by <br />October 16, 2024. This is a request for pricing only and not an approved change. <br />CCD 1 ASI 1 FDC and Storz Connection <br />Provide a new fire department connection on the east side of the building addition. Work will consist of installing a 4" water line and <br />fitting and a new storz connection as shown on plan sheet C2.0, and detail sheet C3.0. <br />Relocate fire department connection piping to ceiling space in level 1 lobby 101. Piping to extend vertically in wall between vestibule <br />100 and adjacent room 102, adjacent to column grid B-1. Coordinate with civil drawings. See sheets A101, P100, FP101, and <br />FP301. <br />Replace 2 wing wall of curtain wall with 6" metal stud walls to see attached A101. <br />Revised Spec Section 211313 - Wet Pipe Sprinkler Systems <br />Revised Spec Section 088000 - Glazing <br />This CCD is being created to document scope changes that were part ofASI 1, incorporating changes required by the building/fire <br />department at the time of approval. <br />Description Amount No Impact <br />Fire Suppression r <br />Additional pricing/comments: <br />Total: <br />This work will _ Increase / _ Decrease HILL FIRE PROTECTION's schedule by days. <br />Requested by: David J. Merkel Submitted by: <br />LARSON-DANIELSON CONST. CO INC Date: <br />Fax:(219)362-2848 <br />Page 1 of 1 <br />