Laserfiche WebLink
BID TAB - Bids Opened: May 27, 2025 <br />City of South Bend <br />2025 Community Crossings Matching Grant <br />AB-2 <br />CONSTRUCTION ENGINEERING <br />LS <br />1 <br />$ 3,736.92 <br />$ 3,736.92 <br />$1,700.00 <br />$1,700.00 <br />$4,700.00 <br />$4,700.00 <br />AB-3 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />$ 2,491.28 <br />$ 2,491.28 <br />$7,000.00 <br />$7,000.00 <br />$4,634.00 <br />$4,634.00 <br />AB-4 <br />EROSION CONTROL <br />LS <br />1 <br />$ 3,736.92 <br />$ 3,736.92 <br />$600.00 <br />$600.00 <br />$2,051.95 <br />$2,051.95 <br />AB-5 <br />COMMON EXCAVATION <br />CYS <br />108 <br />$ 35.00 <br />$ 3,780.00 <br />$63.00 <br />$6,804.00 <br />$40.45 <br />$4,368.60 <br />AB-6 <br />PCCP FOR APPROACHES, 7 IN <br />SYS <br />32.1 <br />$ 93.65 <br />$ 3,006.17 <br />$202.00 <br />$6,484.20 <br />$92.90 <br />$2,982.09 <br />AB-7 <br />PCCP FOR DRIVEWAYS, 6IN <br />SYS <br />27.6 <br />$ 100.00 <br />$ 2,760.00 <br />$121.00 <br />$3,339.60 <br />$112.40 <br />$3,102.24 <br />AB-8 <br />HMA, SURFACE, PG 58S-28, 9.5mm, TYPE B <br />TON <br />63 <br />$ 115.00 <br />$ 7,245.00 <br />$149.00 <br />$9,387.00 <br />$143.65 <br />$9,049.95 <br />AB-9 <br />HMA, INTERMEDIATE, PG 58S-28,19.0 mm, TYPE B <br />TON <br />103 <br />$ 300.00 <br />$ 10,300.00 <br />$107.00 <br />$11,021.00 <br />$102.80 <br />$10,588.40 <br />AB-10 <br />HMA BASE, PG 58S-28, 25.Omm, TYPE B <br />TON <br />164 <br />$ 95.00 <br />$ 15,580.00 <br />$92.00 <br />$15,088.00 <br />$100.55 <br />$16,490.20 <br />AB-11 <br />STORMWATER <br />LS <br />1 <br />$ 3,000.00 <br />$ 3,000.00 <br />$10,000.00 <br />$30,000.00 <br />$4,814.30 <br />$4,814.30 <br />AB-12 <br />MILLING, ASPHALT, 1.5 IN <br />SYS <br />15 <br />$ 3.00 <br />$ 45.00 <br />$200.00 <br />$3,000.00 <br />$119.60 <br />$1,794.00 <br />AB-13 <br />CURB, CONCRETE, 6 IN <br />LFT <br />542 <br />$ 60.00 <br />$ 32,520.00 <br />$43.00 <br />$23,306.00 <br />$32.20 <br />$17,452.40 <br />AB-14 <br />SIDEWALK, CONCRETE, 4 IN <br />SYS <br />30.1 <br />$ 90.00 <br />$ 909.00 <br />$219.00 <br />$2,211.90 <br />$260.60 <br />$2,632.06 <br />AB-15 <br />TRANSVERSE MARKING, CROSSWALK LINE, 24 IN <br />LFT <br />56 <br />$ 13.00 <br />$ 728.00 <br />$25.00 <br />$1,400.00 <br />$25.00 <br />$1,400.00 <br />AB-16 <br />SODDING, NURSERY <br />SYS <br />384 <br />$ 12.00 <br />$ 4,608.00 <br />$38.00 <br />$14,592.00 <br />$27.65 <br />$10,617.60 <br />AB-17 <br />ADIUSTCASTING TO GRADE <br />EA <br />1 <br />$ 1,000.00 <br />$ 1,000.00 <br />$1,200.00 <br />$1,200.00 <br />$467.65 <br />$467.65 <br />AB-18 <br />JADJUSTVALVE TO GRADE <br />EA <br />1 <br />$ 750.00 <br />$ 750.00 <br />$600.00 <br />$600.00 <br />$275.40 <br />$275.40 <br />AB-19 <br />TACK COAT <br />TON <br />0.2 <br />$ 500.00 <br />$ 100.00 <br />$3,600.00 <br />$720wOO <br />$935.95 <br />$187.19 <br />AB-20 <br />SUBGRADE TREATMENT, TYPE II <br />SYS <br />742.3 <br />$ 30.00 <br />$ 22,269.00 <br />$19.00 <br />$14,103.70 <br />$21.10 <br />$15,662.53 <br />AB-21 <br />CURB RAMP, CONCRETE <br />SYS <br />17.3 <br />$ 210.00 <br />$ 3,633.00 <br />$183.00 <br />$3,165.90 <br />$298.90 <br />$5,170.97 <br />AB-22 <br />DETECTABLE WARNING SURFACE <br />SYS <br />5.5 <br />$ 325.00 <br />$ 1,787.50 <br />$195.00 <br />$1,072.50 <br />$181.25 <br />$996.88 <br />AB-23 <br />CONCRETE WALK, REMOVE <br />SYS <br />31.4 <br />$ 25.00 <br />$ 785.00 <br />$17.00 <br />$533.80 <br />$55.65 <br />$1,747.41 <br />AB-24 <br />CONCRETE, REMOVE <br />SYS <br />23.5 <br />$ 10.00 <br />$ 235.00 <br />$29.00 <br />$681.50 <br />$104.70 <br />$2,460.45 <br />AB-25 <br />PAVEMENT, REMOVE <br />SYS <br />475.9 <br />$ 15.00 <br />$ 7,138.50 <br />$9.001 <br />$4,283.30 <br />$6.55 <br />$3,117.15 <br />AB-26 <br />CONCRETE CURB, 6 IN, REMOVE <br />i LET <br />81 <br />$ 15.00 <br />$ 1,215.00 <br />$17.00 <br />$1,377.00 <br />$21.60 <br />$1,749.60 <br />AB-27 <br />COMPACTED AGGREGATENo.53 <br />CYS <br />13 <br />$ 90.00 <br />$ 1,170.00 <br />$125.001 <br />$1,625.00 <br />$338.651 <br />$4,402.45 <br />SUBTOTAL"AB" <br />$140,757.51 <br />$166,000.00 <br />$140,573.99 <br />(SUM OFSUBTOTALS"A"8"B") <br />$2,861,288.36 <br />$1,776,000.00 <br />$2,185,739.98 <br />(SUM OF SUBTOTALS "A","B","AA",&"AB") TOTAL BID <br />$3,182,058.44 <br />$2,138,000.00 <br />$2,495,443.97 <br />I hereby certify that the above truly and accurately represents <br />bids received for this project on May 27, 2025 <br />5/30/2025 <br />Insert signature block (Date) <br />GISTER <br />� <br />Insert Stamp <br />* 10201 173 <br />�0'•.• STATE OF <br />•./NOIAV4 ` <br />