BID TAB - Bids Opened: May 27, 2025
<br />City of South Bend
<br />2025 Community Crossings Matching Grant
<br />AB-2
<br />CONSTRUCTION ENGINEERING
<br />LS
<br />1
<br />$ 3,736.92
<br />$ 3,736.92
<br />$1,700.00
<br />$1,700.00
<br />$4,700.00
<br />$4,700.00
<br />AB-3
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />$ 2,491.28
<br />$ 2,491.28
<br />$7,000.00
<br />$7,000.00
<br />$4,634.00
<br />$4,634.00
<br />AB-4
<br />EROSION CONTROL
<br />LS
<br />1
<br />$ 3,736.92
<br />$ 3,736.92
<br />$600.00
<br />$600.00
<br />$2,051.95
<br />$2,051.95
<br />AB-5
<br />COMMON EXCAVATION
<br />CYS
<br />108
<br />$ 35.00
<br />$ 3,780.00
<br />$63.00
<br />$6,804.00
<br />$40.45
<br />$4,368.60
<br />AB-6
<br />PCCP FOR APPROACHES, 7 IN
<br />SYS
<br />32.1
<br />$ 93.65
<br />$ 3,006.17
<br />$202.00
<br />$6,484.20
<br />$92.90
<br />$2,982.09
<br />AB-7
<br />PCCP FOR DRIVEWAYS, 6IN
<br />SYS
<br />27.6
<br />$ 100.00
<br />$ 2,760.00
<br />$121.00
<br />$3,339.60
<br />$112.40
<br />$3,102.24
<br />AB-8
<br />HMA, SURFACE, PG 58S-28, 9.5mm, TYPE B
<br />TON
<br />63
<br />$ 115.00
<br />$ 7,245.00
<br />$149.00
<br />$9,387.00
<br />$143.65
<br />$9,049.95
<br />AB-9
<br />HMA, INTERMEDIATE, PG 58S-28,19.0 mm, TYPE B
<br />TON
<br />103
<br />$ 300.00
<br />$ 10,300.00
<br />$107.00
<br />$11,021.00
<br />$102.80
<br />$10,588.40
<br />AB-10
<br />HMA BASE, PG 58S-28, 25.Omm, TYPE B
<br />TON
<br />164
<br />$ 95.00
<br />$ 15,580.00
<br />$92.00
<br />$15,088.00
<br />$100.55
<br />$16,490.20
<br />AB-11
<br />STORMWATER
<br />LS
<br />1
<br />$ 3,000.00
<br />$ 3,000.00
<br />$10,000.00
<br />$30,000.00
<br />$4,814.30
<br />$4,814.30
<br />AB-12
<br />MILLING, ASPHALT, 1.5 IN
<br />SYS
<br />15
<br />$ 3.00
<br />$ 45.00
<br />$200.00
<br />$3,000.00
<br />$119.60
<br />$1,794.00
<br />AB-13
<br />CURB, CONCRETE, 6 IN
<br />LFT
<br />542
<br />$ 60.00
<br />$ 32,520.00
<br />$43.00
<br />$23,306.00
<br />$32.20
<br />$17,452.40
<br />AB-14
<br />SIDEWALK, CONCRETE, 4 IN
<br />SYS
<br />30.1
<br />$ 90.00
<br />$ 909.00
<br />$219.00
<br />$2,211.90
<br />$260.60
<br />$2,632.06
<br />AB-15
<br />TRANSVERSE MARKING, CROSSWALK LINE, 24 IN
<br />LFT
<br />56
<br />$ 13.00
<br />$ 728.00
<br />$25.00
<br />$1,400.00
<br />$25.00
<br />$1,400.00
<br />AB-16
<br />SODDING, NURSERY
<br />SYS
<br />384
<br />$ 12.00
<br />$ 4,608.00
<br />$38.00
<br />$14,592.00
<br />$27.65
<br />$10,617.60
<br />AB-17
<br />ADIUSTCASTING TO GRADE
<br />EA
<br />1
<br />$ 1,000.00
<br />$ 1,000.00
<br />$1,200.00
<br />$1,200.00
<br />$467.65
<br />$467.65
<br />AB-18
<br />JADJUSTVALVE TO GRADE
<br />EA
<br />1
<br />$ 750.00
<br />$ 750.00
<br />$600.00
<br />$600.00
<br />$275.40
<br />$275.40
<br />AB-19
<br />TACK COAT
<br />TON
<br />0.2
<br />$ 500.00
<br />$ 100.00
<br />$3,600.00
<br />$720wOO
<br />$935.95
<br />$187.19
<br />AB-20
<br />SUBGRADE TREATMENT, TYPE II
<br />SYS
<br />742.3
<br />$ 30.00
<br />$ 22,269.00
<br />$19.00
<br />$14,103.70
<br />$21.10
<br />$15,662.53
<br />AB-21
<br />CURB RAMP, CONCRETE
<br />SYS
<br />17.3
<br />$ 210.00
<br />$ 3,633.00
<br />$183.00
<br />$3,165.90
<br />$298.90
<br />$5,170.97
<br />AB-22
<br />DETECTABLE WARNING SURFACE
<br />SYS
<br />5.5
<br />$ 325.00
<br />$ 1,787.50
<br />$195.00
<br />$1,072.50
<br />$181.25
<br />$996.88
<br />AB-23
<br />CONCRETE WALK, REMOVE
<br />SYS
<br />31.4
<br />$ 25.00
<br />$ 785.00
<br />$17.00
<br />$533.80
<br />$55.65
<br />$1,747.41
<br />AB-24
<br />CONCRETE, REMOVE
<br />SYS
<br />23.5
<br />$ 10.00
<br />$ 235.00
<br />$29.00
<br />$681.50
<br />$104.70
<br />$2,460.45
<br />AB-25
<br />PAVEMENT, REMOVE
<br />SYS
<br />475.9
<br />$ 15.00
<br />$ 7,138.50
<br />$9.001
<br />$4,283.30
<br />$6.55
<br />$3,117.15
<br />AB-26
<br />CONCRETE CURB, 6 IN, REMOVE
<br />i LET
<br />81
<br />$ 15.00
<br />$ 1,215.00
<br />$17.00
<br />$1,377.00
<br />$21.60
<br />$1,749.60
<br />AB-27
<br />COMPACTED AGGREGATENo.53
<br />CYS
<br />13
<br />$ 90.00
<br />$ 1,170.00
<br />$125.001
<br />$1,625.00
<br />$338.651
<br />$4,402.45
<br />SUBTOTAL"AB"
<br />$140,757.51
<br />$166,000.00
<br />$140,573.99
<br />(SUM OFSUBTOTALS"A"8"B")
<br />$2,861,288.36
<br />$1,776,000.00
<br />$2,185,739.98
<br />(SUM OF SUBTOTALS "A","B","AA",&"AB") TOTAL BID
<br />$3,182,058.44
<br />$2,138,000.00
<br />$2,495,443.97
<br />I hereby certify that the above truly and accurately represents
<br />bids received for this project on May 27, 2025
<br />5/30/2025
<br />Insert signature block (Date)
<br />GISTER
<br />�
<br />Insert Stamp
<br />* 10201 173
<br />�0'•.• STATE OF
<br />•./NOIAV4 `
<br />
|