Laserfiche WebLink
Section II: Plan and Equipment Questionnaire <br />1. Plan or layout for performing proposed work: <br />The proposed jobsite was inspected by one of our Contract Managers during the <br />pre -bid or prior to the bid submittal. During a jobsite visit, attention is directed to <br />the existing conditions and site access. Bowen Engineering Corporation will <br />provide additional information upon request. <br />We intend to construct the job as follows: <br />1. Mobilize <br />2. Construct Initial Chlorination Vault <br />3. Construct Final Chlorination Vault <br />4. Site Work <br />a. UG Electrical Ductbanks <br />b. UG Piping <br />S. Water Treatment Plant <br />a. Piping Modifications <br />b. Install Chemical Feed Upgrades <br />c. Install HVAC Modifications <br />d. Concrete Repairs <br />6. Once Process Equipment has been delivered <br />a. Well 4A Upgrades <br />b. Well 5 Upgrades <br />c. Chemical Feed Upgrades <br />7. Electrical & Mechanical Completion <br />8. Startup <br />9. Final restoration <br />BOWEN <br />