-SUPPLEMENT HISTORY TABLE <br /> CHAPTER 6-BUILDING <br /> ARTICLE 5.CONSTRUCTION PROJECT,TEMPORARY WALKWAYS <br /> c. Other limitations on permit issuance: <br /> I. .. <br /> than one it 4r An excavator may only be issued a permit for sewer and water <br /> line work to the extent necessary to make connection to internal piping of the <br /> structure.Any permit issued under this subsection must be consistent with <br /> the Water Works Rules and Regulations.Engineering and Construction <br /> Standards.and all provisions of this Code,as amended. <br /> 2. A fire protection sprinkler contractor may only be issued a permit to install <br /> or repair fire protection sprinkler systems. <br /> 3. A lawn sprinkler system contractor may only be issued a permit to install or <br /> repair lawn sprinkler systems,including backflow protection devices. <br /> 4. A sewer cleaner may only be issued a permit to repair or alter existing <br /> drainage piping,or to install sewer or water lines,from a distance of two(2) <br /> feet outside of any building or structure to the public way. <br /> 5. A water softener dealer may only be issued a permit to install water softening <br /> equipment or apparatus. <br /> (4) Any contractor performing work pursuant to this Article which is not alread% • [Formatted:Indent Left 0.5",Hanging: 0.5" <br /> covered by a current plumbing license or demolition bond must provide a surety <br /> bond,payable to the City in the penal sum often thousand dollars(S10,000.00). <br /> and conditioned upon faithful compliance with the provisions of the Building <br /> Code and agreeing to pay all damages.costs and expenses caused by the <br /> negligence of the registration through failure to comply with such provisions. <br /> (e) All plumbing installations requiring a permit shall be inspected by the plumbing inspector <br /> three(3)times,once each for underground work,rough-in work,and final completion.A <br /> complete line test shall also be supervised by the plumbing inspector.The plumbing permit <br /> holder shall notify the plumbing inspector at least twenty-four(24)hours in advance of the <br /> time the work is ready for inspection.If the work does not pass inspection,a reinspection <br /> fee offcerty-sixty dollars($(40.00)shall be charged for each future inspection of that stage <br /> of work. <br /> (Ord.No.8243-92,§ 1;Ord.No.8566-94,§ 1;Ord.No.8931-98,§3,8-24-98;Ord.No.9528- <br /> 04,§6;Ord.No.9779-07,§§V,VI,8-27-07;Ord.No. 10137-11,§IV, 12-12-11;Ord.No. <br /> 10394-15,§V, I0-26-15;Ord.No. 10414-16,§I, 1-11-2016) <br /> ARTICLE 5.CONSTRUCTION PROJECT,TEMPORARY WALKWAYS <br /> Sec.6-11 Permit requirements. <br /> (a) All temporary occupancy of public property as hereinafter provided for shall be considered <br /> and treated as being at the will of the City,and will be permitted only in a manner consistent <br /> with the rules by special permit issued-by tlx:City Engineer-as defined in Chapter 18, <br /> Article 7 of the South Bend Municipal Code. <br /> Page 33 of 51 <br />