My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
38-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
sbend
>
Public
>
Common Council
>
Legislation
>
Upcoming Bills
>
2025
>
06-09-2025
>
38-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 9:57:31 AM
Creation date
6/4/2025 3:22:17 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-SUPPLEMENT HISTORY TABLE <br /> CHAPTER 6-BUILDING <br /> ARTICLE 5.CONSTRUCTION PROJECT,TEMPORARY WALKWAYS <br /> Sec.6-10.Fees,registration and permits for plumbing services. <br /> (a) No person shall perform or cause to be performed the installation or alteration of any <br /> plumbing work on or within the City without obtaining,in advance,a permit from the <br /> Department. <br /> (b) Where a person shall unlawfully proceed to do any work or installation without a permit as <br /> required herein,the applicable permit fee shall be tripled as a penalty.The payment of such <br /> penalty shall not release the person in default from any other penalties provided herein,nor <br /> from compliance with any relevant provisions of the municipal code. <br /> (c) Schedule of permit fees.Permits issued for plumbing work within the City shall be subject <br /> to the following fee schedule,with a minimum permit fee being forty sixty dollars <br /> ($460.00). <br /> (I) Each plumbing fixture or trap or set of fixtures on one(1)trap,including water and <br /> drainage piping therefore 6.00 <br /> (2) Each backflow protection 6.00 <br /> (3) Each building sewer: <br /> a. Under 100' 12.00 <br /> b. 100'or over 25.00 <br /> (4) Each building water: <br /> a. Under I00' 12.00 <br /> b. 100'or over 25.00 <br /> (5) Each water softener 7.00 <br /> (6) Each trailer park sewer_10.00 <br /> (7) Each drain within building for rainwater systems 6.00 <br /> (8) Each water heater and/or vent 7.00 <br /> (9) Each gas reconnection49-99 60.00 <br /> (10)Each gas piping system,per outlet_3.00 <br /> (11)Each industrial waste pretreatment interception,including its trap and vent,excepting <br /> kitchen-type grease interceptors functioning as fixture traps_8.00 <br /> (12)Installation,alteration,or repair of water piping and/or water treating equipment 6.00 <br /> (13)Repair or alteration of drainage or vent piping 6.00 <br /> (14)Each drywell_12.00 <br /> (15)Each lawn sprinkler system on any one(1)meter,including backflow protection <br /> devices thereof 6.00 <br /> (16)Fire protection sprinkler system: <br /> a. Up to 30 heads 40700 60.00 <br /> b. Plus each additional 10 heads thereafter 8.00 <br /> (17)Gas Fuel tanks and pumps)2.00 <br /> (18) Back-up generator—Gas line: <br /> a. 10 Kv or less 40400 60.00 <br /> b. Over 10 Kv54 00 70.00 <br /> (19)Each reinspection 40400 60.00 <br /> (20)Each additional final inspection 60-00 75.00 <br /> Page 31 of 5I <br />
The URL can be used to link to this page
Your browser does not support the video tag.