My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:18:49 PM
Creation date
5/27/2025 2:44:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Within ten (10) days of City's acceptance of the Dedicated Improvements, Owner shall <br />provide the City with a maintenance bond equal to ten percent (10%) of the construction cost <br />covering all work performed or to be performed pursuant to this Agreement, and such bond shall <br />remain in effect for three (3) years after dedication as described in Section 10 below. <br />8. Term <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen <br />(16) months from the Effective Date of this Agreement, or upon the issuance of the relevant <br />occupancy permit(s), whichever occurs last. <br />9. Dedication <br />Upon completion of the construction of the Dedicated Improvements substantially as <br />depicted in Exhibit A, the Owner shall also convey an easement and dedicate to the City within <br />such easement the Dedicated Improvements as public infrastructure. It is understood by the Owner <br />that no dedication shall be accepted by the City until all required easements have been conveyed, <br />accepted, and recorded by the City. The Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements are dedicated to the City in a timely manner. <br />Additionally, prior to dedication, the following must be satisfied: <br />a. All parts and labor must meet the standards and requirements stated in the design <br />specifications as presented to and accepted by the City's Engineering Department. <br />b. Lien waivers must be received with regard to all workmanship and materials used in <br />connection with these improvements. <br />c. The Final Dedication must be furnished to Owner by the South Bend, Indiana Board of <br />Public Works. <br />d. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />e. Owner must provide all tests required by City of South Bend Construction Standards and <br />
The URL can be used to link to this page
Your browser does not support the video tag.