My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:26:48 PM
Creation date
5/27/2025 2:38:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT EXPERIENCE <br />Greenway Phase 1/Franciscan Trail from North 13th Avenue to Emerson Avenue <br />CLIENT: City of Beech Grove, IN <br />This new 2.2 mile segment of shared use asphalt path beginning west of Churchman Avenue on Main Street and extending to Emerson <br />Avenue. The majority of the trail follows Lick Creek and crosses the creek at three locations. Additionally, three one -span truss bridges were <br />constructed as part of the project. The trail is an important community connector for the city of Beech Grove. <br />APPROXIMATE CONSTRUCTION COST: $1.3M <br />SERVICES PROVIDED: <br />► Construction Engineering <br />Jackson Street Causeway Pedestrian Walkway <br />CLIENT: Town of Cicero, IN <br />This project provides a walkway along the Morse Reservoir Jackson Street causeway and provides a safe pedestrian connection between Red <br />Bridge Park and Community Park on each side of the reservoir. <br />The three main spans over the waterway utilize prefabricated steel trusses while the 18 remaining spans utilize side -by -side prestressed <br />concrete double-t beams with a concrete overlay. Shell -piles proved to be a cost effective solution for the 21-span structure. Steel sheet piling <br />with a concrete facing ties the proposed walkway into the existing topography. Decorative pedestrian railing and lighting provide safe passage <br />for pedestrians while also enhancing the aesthetic impacts to the trail. <br />A major challenge for this project was coordinating the construction with the existing utilities, which included overhead power lines parallel <br />to the alignment of the pedestrian bridge. The power utility temporarily de -energized their power lines so the contractor could set the bridge <br />components, and permanently relocated their facilities onto the new pedestrian bridge. <br />APPROXIMATE CONSTRUCTION COST: $2.4M <br />SERVICES PROVIDED: <br />No. Design Services <br />► Construction Engineering <br />BEST <br />PLACES <br />t . UNITED CONSULTING 0 CITY OF SOUTH BEND 0 CE SERVICES FOR SAFE ROUTES TO SCHOOL AT KENNEDY ACADEMY 0 DES# 2201237 10 INDIAANn <br />
The URL can be used to link to this page
Your browser does not support the video tag.