BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME: 2025 Community Crossings Matching Grant
<br />PROJECT NO. 125-004
<br />FOR BIDS DUE: May 27, 2025
<br />CONTRACTOR NAME: Milestone Contractors, LP
<br />AA-23
<br />CONCRETE, REMOVE
<br />SYS
<br />68
<br />25.00
<br />$1,700.00
<br />AA-24
<br />NOT USED
<br />AA-25
<br />CONCRETE CURB, 6 IN, REMOVE
<br />LFT
<br />46
<br />15.00
<br />$690.00
<br />AA-26
<br />WOODEN STEPS, REMOVE
<br />LFT
<br />15
<br />46.00
<br />$690.00
<br />AA-27
<br />WOODEN FENCE, REMOVE
<br />LFT
<br />34
<br />40.00
<br />$1,360.00
<br />AA-28
<br />DECIDUOUS TREE, REMOVE
<br />EA
<br />16
<br />875.00
<br />$14,000.00
<br />AA-29
<br />NOT USED
<br />AA-30
<br />COMPACTED AGGREGATE, No. 53
<br />CYS
<br />17.0
<br />109.00
<br />$1,853.00
<br />ALT. 1 SUBTOTAL= $196,000.00
<br />ALTERNATE #2 - HILLSIDE AVENUE
<br />ITEM
<br />NO.
<br />PAY ITEM
<br />UNIT
<br />QUANTITY
<br />UNIT
<br />PRICE
<br />ITEM PRICE
<br />AB-1
<br />MOBILIZATION, DEMOBILIZATION
<br />LS
<br />1
<br />20,703.80
<br />$20,703.80
<br />AB-2
<br />CONSTRUCTION ENGINEERING
<br />LS
<br />1
<br />1,700.00
<br />$1,700.00
<br />AB-3
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />7,000.00
<br />$7,000.00
<br />AB-4
<br />EROSION CONTROL
<br />LS
<br />1
<br />600.00
<br />$600.00
<br />AB-5
<br />COMMON EXCAVATION
<br />CYS
<br />108
<br />63.00
<br />$6,804.00
<br />AB-6
<br />PCCP FOR APPROACHES, 7 IN
<br />SYS
<br />32.1
<br />202.00
<br />$6,484.20
<br />AB-7
<br />PCCP FOR DRIVEWAYS, 6 IN
<br />SYS
<br />27.6
<br />121.00
<br />$3,339.60
<br />AB-8
<br />HMA, SURFACE, PG 58S-28, 9.5mm,
<br />Type B
<br />TON
<br />63.0
<br />149.00
<br />$9,387.00
<br />AB-9 'HMA, INTERMEDIATE, PG 58S-28, 19.0 mm,
<br />TYPE B
<br />TON
<br />103.0
<br />107.00
<br />$11,021.00
<br />AB-10 HMA BASE, PG 58S-28, 25.Omm, TYPE B
<br />TON
<br />164.0
<br />92.00
<br />$15,088.00
<br />AB-11
<br />STORMWATER
<br />LS
<br />1
<br />10,000.00
<br />$10,000.00
<br />AB-12
<br />MILLING, ASPHALT, 1.5 IN
<br />SYS
<br />15
<br />200.00
<br />$3,000.00
<br />AB-23
<br />CURB, CONCRETE, 6 IN
<br />LFT
<br />542
<br />43.00
<br />$23,306.00
<br />AB-14
<br />SIDEWALK, CONCRETE, 4 IN
<br />SYS
<br />10.1
<br />219.00
<br />$2,211.90
<br />AB-15
<br />TRANSVERSE MARKING, CROSSWALK LINE, 24
<br />IN
<br />LFT
<br />56
<br />25.00
<br />$1,400.00
<br />AB-16
<br />SODDING, NURSERY
<br />SYS
<br />384
<br />38.00
<br />$14,592.00
<br />AB-17
<br />ADJUST CASTING TO GRADE
<br />EA
<br />1
<br />1,200.00
<br />$1,200.00
<br />AB-18
<br />ADJUST VALVE TO GRADE
<br />EA
<br />1
<br />600.00
<br />$600.00
<br />AB-19
<br />TACK COAT
<br />TON
<br />0.2
<br />3,600.00
<br />$720.00
<br />AB-20
<br />ISUBGRADE TREATMENT, TYPE 11
<br />SYS
<br />742.3
<br />19.00
<br />1 $14,103.70
<br />
|