My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:24 PM
Creation date
5/13/2025 1:53:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 1 <br />(Exhibit D - Resident Project Representative) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT D, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br /> <br />[Note to User: Delete this Exhibit D if Engineer will not be providing Resident Project Representative <br />Services under Paragraph A1.05.A.2] <br /> <br />Duties, Responsibilities, and Limitations of Authority of Resident Project Representative <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />D1.01 Resident Project Representative <br /> <br />C. Engineer shall furnish a Resident Project Representative (“RPR”) to assist Engineer in observing <br />progress and quality of the Work. The RPR may provide full time representation or may provide <br />representation to a lesser degree. <br />D. Through RPR's observations of Contractor’s work in progress and field checks of materials and <br />equipment, Engineer shall endeavor to provide further protection for Owner against defects and <br />deficiencies in the Work. However, Engineer shall not, during such RPR field checks or as a result <br />of such RPR observations of Contractor’s work in progress, supervise, direct, or have control over <br />Contractor’s Work, nor shall Engineer (including the RPR) have authority over or responsibility <br />for the means, methods, techniques, sequences, or procedures of construction selected or used by <br />any contractor, for security or safety at the Site, for safety precautions and programs incident to <br />any contractor’s work in progress, or for any failure of a contractor to comply with Laws and <br />Regulations applicable to such contractor’s performing and furnishing of its work. The Engineer <br />(including RPR) neither guarantee the performances of any contractor nor assumes responsibility <br />for Contractor’s failure to furnish and perform the Work in accordance with the Contract <br />Documents. In addition, the specific terms set forth in Paragraph A1.05 of Exhibit A of the <br />Agreement are applicable. <br />E. to such contractor’s performing and furnishing of its work. The Engineer (including RPR) neither <br />guarantee the performances of any contractor nor assumes responsibility for Contractor’s failure to <br />furnish and perform the Work in accordance with the Contract Documents. In addition, the <br />specific terms set forth in Paragraph A1.05 of Exhibit A of the Agreement are applicable. <br />F. in accordance with the Contract Documents. In addition, the specific terms set forth in Paragraph <br />A1.05 of Exhibit A of the Agreement are applicable. <br />G. The duties and responsibilities of the RPR are as follows: <br />1. General: RPR is Engineer’s representative at the Site, will act as directed by and under the <br />supervision of Engineer, and will confer with Engineer regarding RPR’s actions. RPR’s <br />dealings in matters pertaining to the Contractor’s work in progress shall in general be with <br />Engineer and Contractor. RPR’s dealings with Subcontractors shall only be through or <br />with the full knowledge and approval of Contractor. RPR shall generally communicate <br />with Owner only with the knowledge of and under the direction of Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.