My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:24 PM
Creation date
5/13/2025 1:53:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 1 <br />Exhibit C – Compensation Packet RPR-1: Resident Project Representative Services – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />COMPENSATION PACKET RPR-1: <br />Resident Project Representative – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />C2.04 Compensation for Resident Project Representative Basic Services – Lump Sum Method of <br />Payment <br /> <br />A. Owner shall pay Engineer for Resident Project Representative Basic Services as follows: <br />1. Resident Project Representative Services: For services of Engineer’s Resident Project <br />Representative, if any, under Paragraph A1.05 of Exhibit A, the Lump Sum amount of <br />$ _______________ . The Lump Sum includes compensation for the Resident <br />Project Representative’s services, and for the services of any direct assistants to the <br />Resident Project Representative. Appropriate amounts have been incorporated in the Lump <br />Sum to account for labor, overhead, profit, and Reimbursable Expenses related to the <br />Resident Project Representative’s Services. <br /> <br />2. Resident Project Representative Schedule: The Lump Sum amount set forth in Paragraph <br />C2.04.A.1 above is based on full-time RPR services on an eight-hour workday Monday <br />through Friday over a day construction schedule. Modifications to the schedule shall <br />entitle Engineer to an equitable adjustment of compensation for RPR services.
The URL can be used to link to this page
Your browser does not support the video tag.