My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:24 PM
Creation date
5/13/2025 1:53:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 3 <br />Exhibit C – Compensation Packet BC-5: Basic Services (other than RPR) – Direct Labor Costs Plus Overhead Plus a Fixed Fee <br />Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />telephone calls and mobile phone charges, reproduction of reports, Drawings, Specifications, <br />Bidding Documents, and similar Project-related items in addition to those required under Exhibit <br />A. In addition, if authorized in advance by Owner, Reimbursable Expenses will also include <br />expenses incurred for the use of highly specialized equipment. <br />C. tion, if authorized in advance by Owner, Reimbursable Expenses will also include expenses <br />incurred for the use of highly specialized equipment. <br />D. of highly specialized equipment. <br />E. The amounts payable to Engineer for Reimbursable Expenses will be the Project-related internal <br />expenses actually incurred or allocated by Engineer, plus all invoiced external Reimbursable <br />Expenses allocable to the Project, the latter multiplied by a factor of . <br />F. The Reimbursable Expenses Schedule will be adjusted annually (as of ____________) to reflect <br />equitable changes in the compensation payable to Engineer. <br /> <br />C2.03 Other Provisions Concerning Payment <br /> <br />A. Whenever Engineer is entitled to compensation for the charges of Engineer’s Consultants, those <br />charges shall be the amounts billed by Engineer’s Consultants to Engineer times a factor of . <br />B. Factors: The external Reimbursable Expenses and Engineer’s Consultant’s factors include <br />Engineer’s overhead and profit associated with Engineer’s responsibility for the administration of <br />such services and costs. <br />C. Estimated Compensation Amounts: <br />1. Engineer’s estimate of the amounts that will become payable for specified services are only <br />estimates for planning purposes, are not binding on the parties, and are not the minimum or <br />maximum amounts payable to Engineer under the Agreement. <br />2. When estimated compensation amounts have been stated herein and it subsequently <br />becomes apparent to Engineer that the total compensation amount thus estimated will be <br />exceeded, Engineer shall give Owner written notice thereof, allowing Owner to consider its <br />options, including suspension or termination of Engineer's services for Owner's <br />convenience. Upon notice, Owner and Engineer promptly shall review the matter of <br />services remaining to be performed and compensation for such services. Owner shall <br />either exercise its right to suspend or terminate Engineer's services for Owner's <br />convenience, agree to such compensation exceeding said estimated amount, or agree to a <br />reduction in the remaining services to be rendered by Engineer, so that total compensation <br />for such services will not exceed said estimated amount when such services are completed. <br />If Owner decides not to suspend Engineer's services during negotiations and Engineer <br />exceeds the estimated amount before Owner and Engineer have agreed to an increase in the
The URL can be used to link to this page
Your browser does not support the video tag.