My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order and PCA - WWTP Degrit Yard Piping Proj No 123-031A - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders & Project Completion Affidavits
>
Change Order and PCA - WWTP Degrit Yard Piping Proj No 123-031A - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:39:54 PM
Creation date
5/13/2025 1:51:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE: <br />PROJECT NO: <br />PROJECT NAME: <br />CONTRACT DATE: <br />CHANGE ORDER NO. <br />CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS =- <br />PROJECT CHANGE ORDER18; <br />04-29-2025 <br />123-031A (DFO PROJ00000435) <br />South Well Wastewater Treatment Plant Yard Piping <br />Improvements - Contract A <br />03-12-2024 <br />SUBJECT OF CHANGE ORDER: Additional Scope Items due to unforeseen conditions, Add'I <br />Hydro Excavation and 3-inch Reuse Water Pipe Repair, Site <br />Restoration <br />All items completed substantially as planned. <br />See attached Comparison of Estimate for overruns and underruns. <br />The original contract sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this Change Order, the project amount is <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />CONTRA OR <br />aa&kl JJ <br />Contractor Signature ma ew Cain, President <br />Matthew D. Cain, President <br />Printed Name and Title <br />HRP Construction, Inc. <br />Company name <br />5777 Cleveland Road / PO Box 266 <br />Address <br />South Bend, IN 46628 <br />City, State, Zip <br />$ <br />479,000.00 <br />$ <br />0.00 <br />$ <br />479,000.00 <br />® Increased <br />❑ Decreased $ <br />$ <br />21,746.00 <br />500,746.00 J3 <br />4.54 % <br />4.54 % <br />07/14/2024 <br />0 Days <br />32 Days <br />8/15/2024 Im <br />RECOMMENDED FOR APPROVAL <br />Construction Manager <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />to�(4 <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />4 7�� <br />Murray L. Miller, Member <br />Joseph R. Molnar, Vice President <br />Breana Micou, Member <br />Attest: Theresa M. Heffner, Clerk <br />Date: May 13, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.