My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Bids
>
Award Bid - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 11:50:16 AM
Creation date
5/13/2025 1:49:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID TABULATION <br />North WTP Improvements <br />Project No: 119-011 <br />�p45pllTH BF a . <br />South Bend WWTP WAS Thickening Improvements <br />Base Bid Bowen Engineering Corporation <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />WAS Thickening improvemetns, including all labor and materials to complete the Work <br />1 <br />LSUM <br />$4,543,275.00 <br />$4,543,275.00 <br />2 <br />Concrete Surface Repair, Floor Surface Repairs, Thickness of 1/4 inch or less (Section 03 0126.76) <br />25 <br />SF <br />$104.00 <br />$2,600.00 <br />3 <br />Concrete Surface Repair, Floor Surface Repairs, Thickness between 1/4 inch and 1 inch (Section 03 01 <br />26.76) <br />25 <br />SF <br />$108.00 <br />$2,700.00 <br />4 <br />Concrete Surface Repair, Floor Surface Repairs, Thickness greater than 1 inch (Section 03 0126.76) <br />1,400 <br />SF <br />$132.00 <br />$184,800.00 <br />5 <br />Concrete Surface Repair, Vertical and Overhead Surface Repairs, Trowel Applied (Section 03 0126.76) <br />25 <br />SF <br />$557.00 <br />$13,925.00 <br />6 <br />Concrete Surface Repair, Vertical and Repairs, Form and Pour, Thickness 6 inches or Less (Section 03 01 <br />26.76) <br />25 <br />SF <br />$348.00 <br />$8,700.00 <br />Total <br />$4,756,OOO.00 <br />Bid Alternate #1 (indicate one): _ Additive _ Deductive <br />Price Difference <br />from Base Bid, per <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit <br />Cost <br />1 <br />GET Manufacturer (46 7116) <br />2 <br />LSUM <br />$0.00 <br />$0.00 <br />Total <br />$0.00 <br />Bid Alternate #2 (indicate one): _ Additive Deductive <br />Price Difference <br />from Base Bid, per <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit <br />Cost <br />2 <br />PCP Manufacturer (43 23 57) <br />2 <br />LSUM <br />$0.00 <br />$0.00 <br />Total <br />$0.00 <br />Base Bid Total $4,756,000.00 <br />Base + Alternates 1 and 2 $4,756,000.00 <br />Equipment Questionnaire <br />Yes <br />Non -Collusion Affadavit <br />Yes <br />Bid Bond <br />Yes <br />MBE Utilization Plan Form MBE-1.0 <br />Yes, exceeds MBE Goal <br />WBE Utilization Plan Form WBE-1.0 <br />Yes, exceeds WBE Goal <br />Evidence of Good Faith Efforts Form MBE-2.0 <br />Yes <br />Evidence of Good Faith Efforts Form WBE-2.0 <br />Yes <br />WBE Contacted Form WBE-2.1 <br />Yes <br />MBE Contacted Form WBE-2.1 <br />Yes <br />Checklist for Bidders <br />Yes <br />Responsible Bidder Checklist <br />Yes <br />Acknowledgement of Receipt of Addendum <br />Yes <br />I hereby certify that th ove truly and accurately represe is bids received for thi project on April 22, 2025 <br />Jacob Klosinski PE, Project Engineer <br />C:\Us \jklosin,\APPDa \Local\Mi,rowR\Windows\INetC,the\COnt,nt0utlOOk\AM3AMK\Bld Tabulation 123-031B <br />
The URL can be used to link to this page
Your browser does not support the video tag.