My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Bids
>
Award Bid - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 11:50:16 AM
Creation date
5/13/2025 1:49:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section II: Plan and Equipment Questionnaire <br />1. Plan or layout for performing proposed work: <br />The proposed jobsite was inspected by our Operations and Preconstruction teams <br />during the pre -bid and prior to the bid submittal. During a jobsite visit, attention is <br />directed to the existing conditions and site access. Once awarded the project, Bowen <br />Engineering Corporation will perform extensive preplanning activities and develop a <br />detailed project schedule. <br />We intend to construct the job generally in line with the recommended construction <br />sequencing plan presented on Sheet C-001 and as follows: <br />A. Upon award of work, begin purchase and submittal process of all long -lead <br />equipment and materials. <br />B. Mobilize on site and install necessary erosion control. <br />C. Work with the City of South Bend to shut down DAF units 2 & 3. <br />D. Demolish DAF units 2 & 3 and install new GBT units, new Polymer Feed system, <br />and associated piping. <br />E. In parallel with installing the new GBT units, demolish and install the new Sludge <br />Thickening Pumps one at a time. <br />F. Test and commission new GBT units and Polymer Feed system. Bring the systerr <br />online. <br />G. Demolish remaining DAF unit 1 and existing chemical systems. <br />H. Perform all surface restoration. <br />I. Demobilize from the site. <br />BOWEN <br />
The URL can be used to link to this page
Your browser does not support the video tag.