Laserfiche WebLink
Page 1 of 1 <br />QUOTE No.: <br />4 <br />02-0525 <br />CERTWIEO <br />RE: <br />COSB Wall Street and Greenlawn <br />/J b <br />L <br />Streetscape <br />Signals & <br />Lighting <br />TO: <br />Commercial. Infrastructure. <br />Industrial <br />DIB <br />CERTIFIED <br />DATE: <br />May 12th 2025 <br />ITEM <br />QTY UNIT <br />DESCRIPTION <br />UNIT <br />COST <br />TOTAL COST <br />NO. <br />2 <br />1.00 LS <br />Mobilization/Demobilization <br />3,000.00 <br />3,000.00 <br />7 <br />1.00 LS <br />Clearing Right of Way (Bollard Removal Only) <br />700.00 <br />700.00 <br />63 <br />128.00 SFT <br />Sheet Sign, 0.080 in. <br />24.00 <br />3,072.00 <br />64 <br />15.00 SFT <br />Sheet Sign, 0.125 in. <br />29.00 <br />435.00 <br />65 <br />325.00 LFT <br />Sign Post, Square, Type 2, Reinforced Anchor base <br />20.00 <br />6,500.00 <br />2.00 Ea <br />Solar Powered Flashing Pedestrian Crossing Assembly <br />12,000.00 <br />24,000.00 <br />66 <br />67 <br />8.00 Ea <br />Lighted Bollard <br />5,000.00 <br />40,000.00 <br />TOTAL <br />77,707.00 <br />MOTE: THE ABOVE ITEMS ARE QUOTED AS A COMPLETE <br />TERMS ; <br />PACKAGE. NO ITEM MAY BE 13ELETED WITHOUT PRIOR <br />APPROVAL. <br />