My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Leeper Court Reconstruction Proj No 124-022 - Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Leeper Court Reconstruction Proj No 124-022 - Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:05:41 PM
Creation date
5/13/2025 1:22:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND�� . x. <br />U O; <br />✓y'; PF ACF..� <br />x s <br />IBti5 <br />PROJECT NAME: VPA Leeper Court Reconstruction <br />PROJECT NO. 124-022 <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />DIVISION C <br />May 13, 2025 <br />Milestone Contractors, LP <br />Item <br />Description <br />Mobilization & Demobilization <br />Quantity <br />Unit i Unit Price <br />Total Amount <br />1 <br />1 <br />LSUM 75,000.00 <br />$75,000.00 <br />2 <br />Construction Layout and Survey <br />1 <br />LSUM 6,259.00 <br />$6,259.00 <br />3 <br />Tree Protection <br />4 <br />EACH <br />430.00 <br />$1,720.00 <br />4 <br />Temporary Const. Fence <br />1305 <br />LFT <br />7.00 <br />$9,135.00 <br />5 <br />Temporary Inlet Protection <br />9 <br />EACH <br />225.00 <br />$2,025.00 <br />6 <br />Temporary Silt Fence <br />769 <br />LFT <br />2.75 <br />$2,114.75 <br />7 <br />Temporary Gravel Const. Entrance <br />72 <br />SYS <br />45.00 <br />$3,240.00 <br />8 <br />Remove Net Anchor <br />14 <br />EACH <br />1,000.00 <br />$14,000.00 <br />9 <br />Remove Net Post <br />28 <br />EACH <br />1,000.00 <br />$28,000.00 <br />10 <br />Fence and Gate Removal <br />1943 <br />LFT <br />6.00 <br />$11,658.00 <br />11 <br />Subbase Preparation <br />9365 <br />SYS <br />10.00 <br />$93,650.00 <br />12 <br />Compacted Aggregate No.53 <br />500 <br />TON <br />82.00 <br />$41,000.00 <br />13 <br />Sidewalk Removal <br />192 <br />SYS <br />76.00 <br />$14,592.00 <br />14 <br />Full Depth Pavement Removal <br />9118 <br />SYS <br />10.00 <br />$91,180.00 <br />15 <br />Concrete Sidewalk 4" <br />195 <br />SYS <br />235.00 <br />$45,825.00 <br />16 <br />Ribbon Curb, 2' <br />0 <br />LFT <br />17 <br />Post -Tensioned Concrete <br />0 <br />SYS <br />18 <br />Chainlink Fencing, Complete <br />1885 <br />LFT <br />66.25 <br />$124,881.25 <br />19 <br />Chainlink Man Gate, 4' Width <br />7 <br />EACH <br />1,200.00 <br />$8,400.00 <br />20 <br />Chainlink Man Gate, 8' Width <br />4 <br />EACH <br />2,450.00 <br />$9,800.00 <br />21 <br />Net Anchor <br />13 <br />EACH <br />5,100.00 <br />$66,300.00 <br />22 <br />Net Post <br />26 <br />EACH <br />5,100.00 <br />$132,600.00 <br />23 <br />Tennis Court Net <br />13 <br />EACH <br />F 1,500.00 <br />$19,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.