|
AIA Document A201- - 2017
<br />General Conditions of the Contract for Construction
<br />Representations
<br />3.2.1,3.5,3.12.6,8.2.1,9.3.3,9.4.2,9.5.1,9.10.1
<br />Representatives
<br />2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.10, 13.2.1
<br />Responsibility for Those Performing the Work
<br />3.3.2, 3.18, 4.2.2, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5.1, 10
<br />Retainage
<br />9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3
<br />Review of Contract Documents and Field Conditions by Contractor
<br />3.2, 3.12.7, 6.1.3
<br />Review of Contractor's Submittals by Owner and Architect
<br />3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2
<br />Review of Shop Drawings, Product Data and Samples by Contractor
<br />3.12
<br />Rights and Remedies
<br />1.1.2, 2.4, 2.5, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.1, 12.2.2, 12.2.4, 13.3, 14,
<br />15.4
<br />Royalties, Patents and Copyrights
<br />3.17
<br />Rules and Notices for Arbitration
<br />15.4.1
<br />Safety of Persons and Property
<br />10.2, 10.4
<br />Safety Precautions and Programs
<br />3.3.1, 4.2.2, 4.2.7, 5.3, 10.1, 10.2, 10.4
<br />Samples, Definition of
<br />3.12.3
<br />Samples, Shop Drawings, Product Data and
<br />3.11, 3.12, 4.2.7
<br />Samples at the Site, Documents and
<br />3.11
<br />Schedule of Values
<br />9.2, 9.3.1
<br />Schedules, Construction
<br />3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2
<br />Separate Contracts and Contractors
<br />1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2
<br />Separate Contractors, Definition of
<br />6.1.1
<br />Shop Drawings, Definition of
<br />3.12.1
<br />Shop Drawings, Product Data and Samples
<br />3.11, 3.12, 4.2.7
<br />Site, Use of
<br />3.13, 6.1.1, 6.2.1
<br />Site Inspections
<br />3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.9.2, 9.4.2, 9.10.1, 13.4
<br />Site Visits, Architect's
<br />3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4
<br />Special Inspections and Testing
<br />AIA Document A201s — 2017. Copyright 1911, 1915, 1916, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 1
<br />and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIAS Document is protected by U.S. Copyright
<br />Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result
<br />in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was
<br />produced by AIA software at 09:02:25 on OS/10 /2017 under Order No. 14965,4162 which expires on 03/09/2018, and is not for resale.
<br />User Notes: (3B9ADA17)
<br />
|