Laserfiche WebLink
AIA Document A201- - 2017 <br />General Conditions of the Contract for Construction <br />13.5 <br />Interpretation <br />1.1.8, 1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1 <br />Interpretations, Written <br />4.2.11,4.2.12 <br />Judgment on Final Award <br />15.4.2 <br />Labor and Materials, Equipment <br />1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, <br />14.2.1.2 <br />Labor Disputes <br />8.3.1 <br />Laws and Regulations <br />1.5, 2.3.2, 3.2.3, 3.2.4, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 10.2.2, 13.1, 13.3.1, 13.4.2, 13.5, 14, 15.2.8, 15.4 <br />Liens <br />2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8 <br />Limitations, Statutes of <br />12.2.5, 15.1.2, 15.4.1.1 <br />Limitations of Liability <br />3.2.2, 3.5, 3.12.10, 3.12.10.1, 3.17, 3.18.1, 4.2.6, 4.2.7, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 9.6.8, 10.2.5, 10.3.3, 11.3, 12.2.5, 13.3.1 <br />Limitations of Time <br />2.1.2, 2.2, 2.5, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7, 5.2, 5.3, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, <br />9.8, 9.9, 9.10, 12.2, 13.4, 14, 15, 15.1.2, 15.1.3, 15.1.5 <br />Materials, Hazardous <br />10.2.4, 10.3 <br />Materials, Labor, Equipment and <br />1.1.3, 1.1.6, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, <br />14.2.1.1, 14.2.1.2 <br />Means, Methods, Techniques, Sequences and Procedures of Construction <br />3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 <br />Mechanic's Lien <br />2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8 <br />Mediation <br />8.3.1, 15.1.3.2, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1, 15.4.1.1 <br />Minor Changes in the Work <br />1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1, 7.4 <br />MISCELLANEOUS PROVISIONS <br />13 <br />Modifications, Definition of <br />1.1.1 <br />Modifications to the Contract <br />1.1.1, 1.1.2, 2.5, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7, 10.3.2 <br />Mutual Responsibility <br />6.2 <br />Nonconforming Work, Acceptance of <br />9.6.6, 9.9.3, 12.3 <br />Nonconforming Work, Rejection and Correction of <br />2.4, 2.5, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2 <br />Notice <br />AIA Document A2019° - 2017. Copyright ' 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 1 <br />and 2017 by The American Institute of Architects. A11 rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright <br />Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result <br />lAIA software at 09:02:25 on 05/10/2017 u <br />n severe c vil and criminal <br />penalties, and wrll be prosecuted to the maxi extent possible under the law. This draft was <br />produced by AIA Order No. 1d96524162 which expires on 03/09/2018, and is not Eor resale. <br />User Notes: (3B9ADA17) <br />