Laserfiche WebLink
AIA Document A2 01- - 2017 <br />General Conditions of the Contract for Construction <br />3.12.5, 3.14.2, 4.2.4, 6, 11.3, 12.2.4 <br />Contractor's Relationship with Subcontractors <br />1.2.2, 2.2.4, 3.3.2, 3.18.1, 3.18.2, 4.2.4, 5, 9.6.2, 9.6.7, 9.10.2, 11.2, 11.3, 11.4 <br />Contractor's Relationship with the Architect <br />1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, <br />9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.4, 15.1.3, 15.2.1 <br />Contractor's Representations <br />3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2 <br />Contractor's Responsibility for Those Performing the Work <br />3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8 <br />Contractor's Review of Contract Documents <br />3.2 <br />Contractor's Right to Stop the Work <br />2.2.2, 9.7 <br />Contractor's Right to Terminate the Contract <br />14.1 <br />Contractor's Submittals <br />3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3 <br />Contractor's Superintendent <br />3.9, 10.2.6 <br />Contractor's Supervision and Construction Procedures <br />1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12, 14, 15.1.4 <br />Coordination and Correlation <br />1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 <br />Copies Furnished of Drawings and Specifications <br />1.5, 2.3.6, 3.11 <br />Copyrights <br />1.5, 3.17 <br />Correction of Work <br />2.5, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2, 12.3, 15.1.3.1, 15.1.3.2, 15.2.1 <br />Correlation and Intent of the Contract Documents <br />1.2 <br />Cost, Definition of <br />7.3.4 <br />Costs <br />2.5, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3, 7.3.3.3, 7.3.4, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.2, 12.1.2, 12.2.1, <br />12.2.4, 13.4, 14 <br />Cutting and Patching <br />3.14, 6.2.5 <br />Damage to Construction of Owner or Separate Contractors <br />3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 12.2.4 <br />Damage to the Work <br />3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4, 12.2.4 <br />Damages, Claims for <br />3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.3.2, 11.3, 14.2.4, 15.1.7 <br />Damages for Delay <br />6.2.3, 8.3.3, 9.5.1.6, 9.7, 10.3.2, 14.3.2 <br />Date of Commencement of the Work, Definition of <br />8.1.2 <br />Date of Substantial Completion, Definition of <br />AIA Document A201" - 2017, Copyright _ 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1967, 1997, 2007 1 <br />and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIAm Document is protected by U,S. Copyright <br />Law and International Treaties, Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result <br />in ere civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law, This draft was <br />produced by AIA software at 09:02:25 on 05/10/2017 under Order No. 1496524162 which expires on 03/09/2019, and is not for resale. <br />User Notes: (3B9ADA17) <br />