Laserfiche WebLink
AIA Document A133° - 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum <br />Price <br />§ 14.3.2.1 The Construction Manager shall provide bonds as set forth in AIA Document <br />A133TM-2019 Exhibit B, and elsewhere in the Contract Documents, including but not limited to <br />a Performance Bond and Payment Bond in the amount of 100% of the Guaranteed Maximum <br />Price <br />§ 14.4 Notice in electronic format, pursuant to Article 1 of AIA Document A201-2017, may be <br />given in accordance with AIA Document E203TM-2013, Building Information Modeling and <br />Digital Data Exhibit, if completed, or as otherwise set forth below: <br />(If other than in accordance with AIA Document E203-2013, insert requirements for delivering <br />notice in electronic format such as name, title, and email address of the recipient and whether <br />and how the system will be required to generate a read receipt for the transmission.) <br />§ 14.5 Other provisions: <br />ARTICLE 15 SCOPE OF THE AGREEMENT <br />§ 15.1 This Agreement represents the entire and integrated agreement between the Owner and <br />the Construction Manager and supersedes all prior negotiations, representations or agreements, <br />either written or oral. This Agreement may be amended only by written instrument signed by <br />both Owner and Construction Manager. <br />§ 15.2 The following documents comprise the Agreement: <br />.1 AIA Document A133T"'-2019, Standard Form of Agreement Between Owner and Construction <br />Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a <br />Guaranteed Maximum Price, as modified <br />.2 AIA Document A133T"4-2019, Exhibit A, Guaranteed Maximum Price Amendment, to be executed at <br />a later date <br />.3 AIA Document A133T'vl-2019, Exhibit B, Insurance and Bonds, as modified <br />.4 AIA Document A201Tm-2017, General Conditions of the Contract for Construction <br />,5 Other Exhibits: <br />(Check all boxes that apply.) <br />1X} <br />In <br />Exhibit 1: Design Scope document, by _ <br />Exhibit 2: Personnel Labor Rates, dated <br />IA Document A133 - 2019. Copyright 1991, 2003, 2009, and 2019. All rights reseried. "The American institute of 37 <br />Architects," "American Institute of Arrehir e cc a," "AIA," the AIA Logo, and "AIA Contract Docume urs" are trademar%s of The O <br />Pmerican Institute of ? itect a:; This draft w s produced at OE:52:26 ET on 10/11/2023 under Order PIo.2114 d 1'497 �,uhich <br />expires on 10/10/2024, r not fo- resale_, is licensed for one -rime use only, and may only be used i accordance with the <br />AIA Contract Documentsi Terms of Service. To report copyright violations, _-mail docinfo@aiacontracts,com; <br />User Notes: <br />