My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Contract - Madison Lifestyle Parking Garage CMc Proj No 123-074 - FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Contract - Madison Lifestyle Parking Garage CMc Proj No 123-074 - FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:06:53 PM
Creation date
5/5/2025 9:29:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA Document A133® - 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum <br />Price <br />The Madison Street Garage is approximately a 664-space, seven -story structured garage and <br />concrete podium which will facilitate the construction of multi -family housing and commercial <br />space that will wrap the parking structure. <br />§ 1.1.2 The Project's physical characteristics: <br />(Identify or describe pertinent information about the Project's physical characteristics, such as <br />size; location; dimensions; geotechnical reports; site boundaries; topographic surveys; traffic <br />and utility studies; availability of public and private utilities and services; legal description of <br />the site, etc.) <br />The program for the Project is described in the Design Scope document, prepared by American <br />Structurepoint and incorproated as Exhibit l . <br />§ 1.1.3 The Owner's budget for the Guaranteed Maximum Price, as defined in Article 6: <br />(Provide total and, if known, a line item breakdown.) <br />Not to exceed <br />Guaranteed Maximum Price budget <br />§ 1.1.4 The Owner's anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />Unknown at the time of execution of this agreement. The Owner, Architect, and <br />Construction Manager will work together to define a mutually agreeable project <br />schedule, including design activities. <br />.2 Construction commencement date: <br />subject to change per the mutually agreeable project schedule <br />noted above. <br />.3 Substantial Completion date or dates: <br />IA Document A133 - 2019. Copyright "s 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of 3 <br />Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The <br />American Institute of Architects. This draft was produced at 08:52:26 ET on 10/11/2023 under Order No.2114477497 which <br />expires on 10/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the <br />AIA Contract Documents` Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.