Laserfiche WebLink
AIA Document A133S - 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum <br />Price <br />Construction Manager, shall thereafter agree to a corresponding change in the Project's scope <br />and quality. <br />§ 4.1.4 Structural and Environmental Tests, Surveys and Reports. During the <br />Preconstruction Phase, the Owner shall furnish the following information or services with <br />reasonable promptness. The Owner shall also furnish any other information or services under the <br />Owner's control and relevant to the Construction Manager's performance of the Work with <br />reasonable promptness after receiving the Construction Manager's written request for such <br />information or services. The Construction Manager shall be entitled to rely on the accuracy of <br />information and services furnished by the Owner but shall exercise proper precautions relating to <br />the safe performance of the Work. <br />§ 4.1.4.1 The Owner shall furnish tests, inspections, and reports, required by law and as <br />otherwise agreed to by the parties, such as structural, mechanical, and chemical tests, tests for air <br />and water pollution, and tests for hazardous materials. <br />§ 4.1.4.2 The Owner shall furnish surveys describing physical characteristics, legal limitations <br />and utility locations for the site of the Project, and a written legal description of the site. The <br />surveys and legal information shall include, as applicable, grades and lines of streets, alleys, <br />pavements and adjoining property and structures; designated wetlands; adjacent drainage; rights - <br />of -way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and <br />contours of the site; locations, dimensions and other necessary data with respect to existing <br />buildings, other improvements and trees; and information concerning available utility services <br />and lines, both public and private, above and below grade, including inverts and depths. All the <br />information on the survey shall be referenced to a Project benchmark. <br />§ 4.1.4.3 The Owner, when such services are requested, shall furnish services of geotechnical <br />engineers, which may include test borings, test pits, determinations of soil bearing values, <br />percolation tests, evaluations of hazardous materials, seismic evaluation, ground corrosion tests <br />and resistivity tests, including necessary operations for anticipating subsoil conditions, with <br />written reports and appropriate recommendations. <br />§ 4.1.5 During the Construction Phase, the Owner shall furnish information or services required <br />of the Owner by the Contract Documents with reasonable promptness. The Owner shall also <br />furnish any other information or services under the Owner's control and relevant to the <br />Construction Manager's performance of the Work with reasonable promptness after receiving <br />the Construction Manager's written request for such information or services. <br />§ 4.1.6 If the Owner identified a Sustainable Objective in Article 1, the Owner shall fulfill its <br />responsibilities as required in AIA Document E234TM-2019, Sustainable Projects Exhibit, <br />Construction Manager as Constructor Edition, attached to this Agreement. <br />IA Document A133 - 2019. Copyright g 1991, 2003, 2009, and 2019. All rights reserved,."The American Institute of 15 <br />Architects,, "American Institute of Arehi to cts," "AIA," the AIA Logo, and "AIA Contract Docymen ts" are trademarks of The <br />American Institute of Architects, This draft was produced at OP:SZ :2o ET on 10/11/2023 under Order No.2119977997 which <br />expires on 10, 10/2029, is not for resale, is licensed for one-time use only, and may only be used in accordance with the <br />AIA Contract Documents• Terms of Service. To report copyright violations, e-mail docinfo@ai acontracts.com. <br />User Notes: <br />