Laserfiche WebLink
Section II: Plan and Equipment Questionnaire <br />1. Plan or layout for performing proposed work: <br />The proposed jobsite was inspected by our Operations and Preconstruction teams <br />during the pre -bid and prior to the bid submittal. During a jobsite visit, attention is <br />directed to the existing conditions and site access. Once awarded the project, Bowen <br />Engineering Corporation will perform extensive preplanning activities and develop a <br />detailed project schedule. <br />We intend to construct the job generally in line with the recommended construction <br />sequencing plan presented on Sheet C-001 and as follows: <br />A. Upon award of work, begin purchase and submittal process of all long -lead <br />equipment and materials. <br />B. Mobilize on site and install necessary erosion control. <br />C. Work with the City of South Bend to shut down DAF units 2 & 3. <br />D. Demolish DAF units 2 & 3 and install new GBT units, new Polymer Feed system, <br />and associated piping. <br />E. In parallel with installing the new GBT units, demolish and install the new Sludge <br />Thickening Pumps one at a time. <br />F. Test and commission new GBT units and Polymer Feed system. Bring the systerr <br />online. <br />G. Demolish remaining DAF unit 1 and existing chemical systems. <br />H. Perform all surface restoration. <br />I. Demobilize from the site. <br />BOWEN <br />