Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: South Bend WWTP WAS Thickening Improvements <br />Project Number: 123-031 B <br />For Bids Due: April 22, 2025 <br />Contractor Name: Bowen Engineering Corporation <br />BASE BID <br />45pUTH BE�O <br />2 <br />� d <br />W <br />1865 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />WAS Thickening improvements, including all <br />1 <br />LSUM <br />4,543,275 <br />4,543,275 <br />labor and materials to complete the Work <br />Concrete Surface Repair, Floor Surface <br />2 <br />Repairs, Thickness of 1/4 inch or less <br />25 <br />SF <br />104 <br />2600 <br />Section 03 01 26.76 <br />Concrete Surface Repair, Floor Surface <br />3 <br />Repairs, Thickness between 1/4 inch and 1 <br />25 <br />SF <br />108 <br />2700 <br />inch Section 03 01 26.76 <br />Concrete Surface Repair, Floor Surface <br />4 <br />Repairs, Thickness greater than 1 inch <br />1,400 <br />SF <br />132 <br />184,800 <br />Section 03 01 26.76 <br />Concrete Surface Repair, Vertical and <br />5 <br />Overhead Surface Repairs, Trowel Applied <br />25 <br />SF <br />557 <br />13,925 <br />Section 03 01 26.76 <br />Concrete Surface Repair, Vertical and <br />6 <br />Repairs, Form and Pour, Thickness 6 inches <br />25 <br />SF <br />348 <br />8700 <br />or Less Section 03 01 26.76 <br />BASE BID TOTAL 4,756,000 <br />BID ALTERNATES <br />Bid Alternate #1 (indicate one): _ Additive _ Deductive <br />Price <br />Item <br />Description <br />Manufacturer <br />Quantity <br />Unit <br />Difference <br />Total Amount <br />No. <br />from Base <br />Bid, per Unit <br />1 <br />GBT Manufacturer <br />2 <br />LSUM <br />46 71 16 <br />ALTERNATE #1 TOTAL N/A <br />Bid Alternate #2 (indicate one): _ Additive _ Deductive <br />Price <br />Item <br />Description <br />Manufacturer <br />Quantity <br />Unit <br />Difference <br />Total Amount <br />No. <br />from Base <br />Bid, per Unit <br />PCP Manufacturer <br />2 <br />2 <br />LSUM <br />43 23 57 <br />ALTERNATE #2 TOTAL N/A <br />Version 5/20/2024 Contractor's Bid for Public Works - 7 <br />