Laserfiche WebLink
SELGE CONSTRUCTION CO., INC. <br />COMPLETED PROJECT DESCRIPTIONS <br />Description: <br />INDOT R38065C — Coal Line SJ Co. Bike & Ped Path Phase II (734) — Owner: Indiana <br />Department of Transportation. Bike and pedestrian path along the Coal Line Trail from <br />Northshore Drive to East Bank Trail Phase II in the City of South Bend. $1,939,039.00. <br />Completed: 2024. <br />Description: <br />INDOT R37502A — Auten Road Bike & Ped Facilities (714) — Owner: Indiana Department of <br />Transportation. Bike and pedestrian path along Auten Road from Laurel Road to SR 933. <br />$888,813.00. Completed: 2024. <br />Description: <br />INDOT R38064A — Coal Line SJ Co. Bike & Ped Path (689) — Owner: Indiana Department of <br />Transportation. Bike and pedestrian path along the Coal Line Trail from Lincolnway West to <br />Riverside Drive. $1,976,699.00. Completed: 2024. <br />Description: <br />SR 331 Emergency Water Main Replacement (767) — Owner: Town of Bremen. Installation of <br />1230 feet of new water main, two new hydrant assemblies, approx. 500 SY of pavement <br />restoration, approx. 1200 CY of structural backfill, erosion control and restoration. $509,253. <br />Completed: 2024. <br />Description: <br />White Pigeon Sanitary Sewer Restoration (766) — Owner: SJ County Board of Public Works <br />Replacement of existing sanitary sewer, sidewalk replacement and restoration. $176,000. <br />Completed: 2024. <br />Description: <br />MEC Smart Park Development (735) — Owner: Midwest Energy & Communications — <br />Cassopolis, Michigan. Construction of utilities (sanitary sewer & force main, sanitary lift station, <br />water main and storm sewer), large retention ponds, 8200 feet of roadway construction, and <br />associated site grading on an approx. 230 acre site. Additional improvements to surrounding <br />MDOT and county roads. $12,703,046. Completed: 2024. <br />Description: <br />Veterans Park Lift Station (725) — Owner: City of Mishawaka. Construction of a submersible <br />lift station including wet well, valve vault, meter vault, pumps, piping, valves, controls, auxiliary <br />generator, SCADA, site work and all associated appurtenances. Project also includes approx.. <br />830 LF of force main, 85 LF sanitary sewer, 500 LF of watermain & associated surface <br />restoration. $1,938,859. Completed: 2024. <br />Description: <br />