My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 2 Proj No 117-059A - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 2 Proj No 117-059A - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 2:37:49 PM
Creation date
4/22/2025 2:37:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A310 ™ -2010 <br />Conforms with The American Institute of Architects AIA Document 310 <br />Bid Bond <br />CONTRACTOR: (N1111111, legal .1·/11/11.v mul 11ddre.'i.<:) R. Yoder Construction, Inc. <br />27 453 County Road 150 <br />Nappanee, IN 46550 <br />OWNER: (N<rml!, !.•gal stnt11s and nddrl!SS) South Bend Board of Public Works <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />BOND AMOUNT: $ 5% <br />PROJECT: <br />SURETY: (Name, lega/.v/11/11.1· 111ulpri11clpal place 1!fh11si111:ss) Euler Hermes North America Insurance Company <br />100 International Drive, 22nd Floor <br />Baltimore, MD 21202 <br />Five Percent of Amount Bid (Naml!, locntio11 or nddrl!ss, n11d l'rqjl!CI 1111111be1; if a11,1� This document has important iogal consoquoncos. Consultation with an attorney Is encouraged <br />with respect to Its completion or <br />modification, <br />Any singular roforonce lo Contractor, surety, owner or <br />other party shall be considered <br />plural where applicable. <br />Contract No. 117-059A-South Well Field, Water Treatment Plant, and Distribution System Improvements <br />(Bid Package 2) -South Bend, IN <br />The Contractor and Surety arc bound to the Owner in the :unounl sci forth above, for the payment of which the Contractor and Surely bind <br />lhemseh•es. their heirs, executors, administrators, snecessors and assigns.jointly and severally, ns provided herein. The conditions of this <br />Doud ore such that if the Owner acccpls the bid of the Contractor within the lime specified in the bid documents, or within such time period <br />ns mny bo agreed to by the Owner nnd Contrnctor, and the Contrnctor either (I) enters into n contrncl with tho Owner in accord ance with <br />the terms of such bid, nnd gil'cs such bond or bonds ns may be specified in tho bidding or Contract l)ocumcnls, with a surety admitted in <br />the Jurisdiction ot'the l'rojcel and otherwise acceptable to !he Owner, for !ho faithful performance of such Contract ond for the prompt <br />payment of labor and material furnished in the prosecution thereof; or (2) pays to tho Owner the difference, no! to exceed the amount of <br />this Uond, between the amount specified in said bid and such forger 0111011111 for which the Owner may in good faith cont met with another <br />party lo perform the work cm·erc<l hy sui<l bid, !hen this obligulion shull be null und void, otlmwise to rcmuin in t'ull force uml cil'ccl. The <br />Surely hereby wuivcs uny notice of utl 11greeme11t ocl1vcc11 the Owner un<l Conlruclor lo cxlen<l lhc time in which the Owner muy ucccpt the <br />hid. Wuivcr of noticu hy the Surety shull not upply to u11y extension exceeding sixty (60) <lays in the uggrcgulc beyond the lime 1hr <br />ucccplunce ol'bi<ls specified in the hid <locumcnls, un<l tht: Owner un<l Contmctur shall ohluin the Surct)'s consent for uu extension beyond <br />sixty (60) duys. <br />If this Bond is issued in co11ncctio11 with n subcontractor's bid lo n Co11tractor. the tcnn Contractor in this Doud shall bo deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this nond has been liimishc<l 10 comply with u stululory or other lcgul requirement in !he luculion oft he Project, uny pnwision in <br />this non<l conllicting with sui<l slululory or legul rcquircmcnl shull bo deemed <lclelc<l hcrciiom und pro1·isions confonning lo such <br />slululnry or other lcgul requirement shull be deemed incorpnrule<l herein. When so li1mishc<l, the intent is that this nond shull be construed <br />us a slututury bond und not us u common luw bond. <br />Signed nnd scaled this 22nd day of April, 2025 <br />S-0054/AS 8/10 <br />R. Yoder Construction, Inc. <br />By: <br />{{it/i!)
The URL can be used to link to this page
Your browser does not support the video tag.