My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 1 Proj No 117-059A - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 1 Proj No 117-059A - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:09:16 PM
Creation date
4/22/2025 2:35:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�'� <br />CITY OF SOUTH BEND 1� � <br />MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN l/\/,���� <br />FORM MBE-2.0 \_-„,,,_� <br />EVIDENCE OF GOOD FAITH EFFORTS <br />1 affirm that I have matle good faith efforts to assist interested MBEs in obtaining necessary <br />BY <br />equipment, supplies, materials, or related assistances or services, where approptlata. <br />1 aKtrm that I did not reject any MBEs as unqualifletl without sound business reasons based <br />on a thorough investigation of (hair capabilities. <br />BY <br />CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on <br />the subcontracting opportunity: <br />t. Name, address, antl telephone number; <br />2. A dascrip8on of information provided by the bidder or subcontrector; and <br />3. A statement of whether an agreement was reached, and if not, why noq including any reasons for <br />concluding that the MBE was unqualifietl to partorm fha job. <br />Proper demonstration oT Gootl Faith Efforts requires your Initials n¢xt to all of fha above boxes. Any <br />omissions shall ba considered grounds for roJ¢ctlon oT the bid by the Board oT Public Works. Tha Clty oT <br />South Bend reserves the right to request additional Information. <br />Version 09/29/202t Contractor's Bitl for Public Works - t t <br />
The URL can be used to link to this page
Your browser does not support the video tag.